Laserfiche WebLink
<br />Main Avenue MOD <br />Page 5 of 8 <br />October 20, 2008 <br /> <br />III. SERVICE ROADS <br /> <br />SEGMENT 2 - THE SHEYENNE RIVER TO 5TH STREET EAST <br /> <br />1. Provide the 80.93% federal funds for construction of frontage road from the <br />Sheyenne River to sth Street East. <br /> <br />2. Provide construction engineering services for all work from the Sheyenne River <br />to 5th Street East. <br /> <br />The city of West Fargo: <br /> <br />1. Provide all of the 19.07% local match necessary for the use of federal <br />funds. <br /> <br />2. Maintain the roadway, to include: pavement markings, pedestrian crossings and <br />markings, signs, curb and gutter, street lighting, sign lighting, drainage, <br />pavement maintenance, and snow plowing and snow removal. <br /> <br />SEGMENT 3 - 5th STREET EAST TO 45TH STREET <br /> <br />1. Provide the 80.93% federal funds for construction of frontage road from sth <br />Street East to 4Sth Street. <br /> <br />2. Provide construction engineering services for all work from 5th Street to 45th <br />Street. <br /> <br />The city of West Fargo: <br /> <br />1. Provide the 19.07% local match necessary for the use of federal funds. <br /> <br />2. Maintain the roadway, to include: pavement markings, pedestrian crossings and <br />markings, signs, curb and gutter, street lighting, sign lighting, drainage, <br />pavement maintenance, and snow plowing and snow removal. <br /> <br />IV. LANDSCAPING <br /> <br />SEGMENTS 1,2 & 3 - 1-94 TO 4STH STREET <br /> <br />NDDOT will: <br /> <br />1. Provide the 80.93% federal funds for construction of landscaping from 1-94 to <br />4Sth Street. <br />