3a. Road Dept-Main Ave reconstruction
Laserfiche
>
Public
>
County Commission
>
2008
>
12-15-2008
>
Regular agenda
>
3a. Road Dept-Main Ave reconstruction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2008 11:03:10 AM
Creation date
12/9/2008 10:58:02 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Main Avenue MOD <br />Page 4 of 8 <br />October 20, 2008 <br /> <br />SEGMENT 2 - THE SHEYENNE RIVER TO 5TH STREET EAST <br /> <br />NDDOT will: <br /> <br />I. Provide the 80.93% federal funds for construction of multi-use trail from the <br />Sheyenne River to 5th Street East as shown in red on the attached layout sheets. <br /> <br />2. Provide construction engineering services for all work from the Sheyenne River <br />to 5th Street East. <br /> <br />The city of West Fargo will: <br /> <br />1. Provide all 19.07% local match for the use of federal aid for project work within <br />the city limits as shown in the red on the attached layout sheets. <br /> <br />2. Maintain the multi-use path, to include: routine maintenance and snow plowing <br />and snow removal from the Sheyenne River to 5th Street East, as shown in the <br />red on the attached layout sheets. <br /> <br />SEGMENT 3 - 5th STREET EAST TO 45TH STREET <br /> <br />NDDOT will: <br /> <br />1. Provide the 80.93% federal funds for construction of multi-use trail from 5th <br />Street East to 45th Street. <br /> <br />2. Provide construction engineering services for all work from 5th Street East to 45th <br />Street. <br /> <br />The city of West Fargo will: <br /> <br />1. Provide all of the 19.07% local match limits as necessary for the use of federal <br />aid for project work within the city limits as shown in the red on the attached <br />layout sheets. <br /> <br />2. Maintain the multi-use path, to include: routine maintenance and snow plowing <br />and snow removal from 5th Street East to 45th Street. <br />
The URL can be used to link to this page
Your browser does not support the video tag.