Laserfiche WebLink
<br />Main Avenue MOD <br />Page 4 of 8 <br />October 20, 2008 <br /> <br />SEGMENT 2 - THE SHEYENNE RIVER TO 5TH STREET EAST <br /> <br />NDDOT will: <br /> <br />I. Provide the 80.93% federal funds for construction of multi-use trail from the <br />Sheyenne River to 5th Street East as shown in red on the attached layout sheets. <br /> <br />2. Provide construction engineering services for all work from the Sheyenne River <br />to 5th Street East. <br /> <br />The city of West Fargo will: <br /> <br />1. Provide all 19.07% local match for the use of federal aid for project work within <br />the city limits as shown in the red on the attached layout sheets. <br /> <br />2. Maintain the multi-use path, to include: routine maintenance and snow plowing <br />and snow removal from the Sheyenne River to 5th Street East, as shown in the <br />red on the attached layout sheets. <br /> <br />SEGMENT 3 - 5th STREET EAST TO 45TH STREET <br /> <br />NDDOT will: <br /> <br />1. Provide the 80.93% federal funds for construction of multi-use trail from 5th <br />Street East to 45th Street. <br /> <br />2. Provide construction engineering services for all work from 5th Street East to 45th <br />Street. <br /> <br />The city of West Fargo will: <br /> <br />1. Provide all of the 19.07% local match limits as necessary for the use of federal <br />aid for project work within the city limits as shown in the red on the attached <br />layout sheets. <br /> <br />2. Maintain the multi-use path, to include: routine maintenance and snow plowing <br />and snow removal from 5th Street East to 45th Street. <br />