3a. Road Dept-Main Ave reconstruction
Laserfiche
>
Public
>
County Commission
>
2008
>
12-15-2008
>
Regular agenda
>
3a. Road Dept-Main Ave reconstruction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2008 11:03:10 AM
Creation date
12/9/2008 10:58:02 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Main A venue MOD <br />Page 3 of 8 <br />October 20, 2008 <br /> <br />The city of West Fargo will: <br /> <br />1. Provide the 10% local funds match as necessary for the use of federal aid for <br />project work within the city limits as shown in yellow on the attached layout <br />sheets. This total cost will include the actual construction cost plus 10% for the <br />preliminary and construction engineering; and will pay 100% of the construction <br />costs plus 10% for the preliminary and construction engineering of all items not <br />eligible for federal aid participation. <br /> <br />2. Maintain the roadway and sidewalk, to include: pavement markings, pedestrian <br />crossings and markings, signs, curb and gutter, street lighting, sign lighting, <br />drainage, pavement maintenance, snow plowing and snow removal, and traffic <br />signals. <br /> <br />II. Multi-Use Trail <br /> <br />SEGMENT 1 - 1-94 TO THE SHEYENNE RIVER <br /> <br />NDDOT will: <br /> <br />1. Provide the 80.93% federal funds for construction of multi-use trail from 1-94 to <br />the Sheyenne River. <br /> <br />2. Provide construction engineering services for all work from 1-94 Interchange to <br />the Sheyenne River. <br /> <br />The county of Cass will: <br /> <br />1. Provide all of the 19.07% local match limits as necessary for the use of federal <br />aid for project work within the county from 1-94 to 11 th Street West, as shown in <br />green on the attached layout sheets. <br /> <br />2. Maintain the multi-use trail, to include: routine maintenance and snow plowing <br />and snow removal from 1-94 to 11 th Street West, as shown in green on the <br />attached layout sheets. <br /> <br />The city of West Fargo will: <br /> <br />1. Provide the 19.07% local match for the use of federal aid for project work within <br />the city from 11 th Street West to the Sheyenne River, as shown in red on the <br />attached layout sheets. <br /> <br />2. Maintain the multi-use path, to include: routine maintenance and snow plowing <br />and snow removal from 1-94 to 11 th Street West to the Sheyenne River, as shown <br />in red on the attached layout sheets. <br />
The URL can be used to link to this page
Your browser does not support the video tag.