i. Septic system permit fees--Fargo Cass Public Health
Laserfiche
>
Public
>
County Commission
>
2008
>
04-07-2008
>
Consent agenda
>
i. Septic system permit fees--Fargo Cass Public Health
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2008 12:42:09 PM
Creation date
4/1/2008 12:41:04 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />inspection. Upon completion and final inspection of the system, if <br />found satisfactory and meeting the approval of the inspection, the <br />designated officer shall issue to the applicant a certificate of approval. <br /> <br />If, upon inspection, the designated officer discovers that any part of <br />the system is not constructed in accordance with the minimum <br />standards provided in these regulations, the applicant shall be <br />responsible for the correction or elimination of all defects, and no <br />system shall be placed in service until all defects have been <br />corrected or eliminated. <br /> <br />SECTION VI - PERMIT FOR INSTAllATION OF ON-SITE <br />SYSTEMS <br /> <br />No person, firm, or corporation shall install, alter, repair, or extend <br />any individual on-site sewage system in the county without first <br />obtaining a permit from the designated officer. <br /> <br /> <br />Application for permits shall be made upon forms furnished by the <br />designated officer and shall be signed by the applicant. Said permit <br />to construct is valued for a period of 12 months from date of <br />issuance. If construction is not started within this period, the permit is <br />void, unless an extension is granted by the designated Health Officer. <br /> <br />The Health Officer shall refuse to grant a permit for the construction <br />of an individual sewage disposal system where a public sewer <br />system is available. <br /> <br />If construction is not started on the building or septic system within 12 <br />months of the date of approval of the application, it will be necessary <br />to resubmit an application and plot plan for the system to assure that <br />the lot or house plan or location have not changed. <br /> <br />SECTION VII - SEVERABILITY <br /> <br />In any section, subsection, sentence, clause, phrase or portion of <br />these regulations is for any reason held to be invalid or <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.