3. Courthouse west addn-contract addendum
Laserfiche
>
Public
>
County Commission
>
2007
>
11-19-2007
>
Regular agenda
>
3. Courthouse west addn-contract addendum
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2007 2:02:28 PM
Creation date
11/14/2007 9:04:46 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Courts Programming & Design KIMME & Associates <br /> <br />I W AUKESHA COUNTY, WI. (Waukesha) COURTS ADDITION <br />1 Services: System Assessment/Options Ana1ysislP~~~nglDesign <br /> <br /> <br />''''/lllt <br />~,. <br /> <br /> <br />Client Name: <br />Contact: <br />Phone Number: <br /> <br />Waukesha County Board of Supervisors <br />Carolyn Evenson, Clerk of the Circuit Court <br />(262) 548-7582 <br /> <br />Dates of Service: <br /> <br />Justice System Study 2000; Budget & Concept Study & Program 2001; <br />Design 2002-03; Courts Design 2005 <br /> <br />K&A team members who participated and in what capacity: <br />D. Kimme, System Analysis/Needs Assessment/ProgramlDesign <br />D. Bostwick, Needs Assessment/Program <br />G. Bowker, Programming/Staff Needs Analysis <br /> <br />Project Description: <br />· Replacing an existing old jail facility with a new four-story secure courts tower <br />at the intersection of the existing courthouse and a new jail addition was the <br />challenge in this project. <br />· The Secure Courts addition was Phase 2 of a three phase master plan with the jail <br />addition being the first phase. That phase is fully constructed and operational. <br />· The proposed secure courts facility is to be directly linked to the jail addition <br />thus correcting security deficiencies. The result was the highest level of secure <br />inmate movement efficiency possible. <br />· The courts design is for a four story facility providing six secure jury <br />courtrooms, and two commissioners hearing rooms for initial intakes, thus <br />measurably increasing court capabilities in this rapidly growing suburb of <br />Milwaukee. <br />· The design process involved examining various levels of construction consistent <br />with the county budget. <br />· A single, secure checkpoint provides for better public movement control and <br />efficiency. However, controlled staff access to the existing courthouse was <br />provided at multiple levels for staff convenience. <br />· Covered parking for the judiciary was provided at the ground level below the <br />adjacent jail addition. <br />· Court support includes clerks fine payment rooms adjacent to the intake courts, a <br />professional work room, a bailiffs briefing room, and public waiting areas. <br />· Development of video visiting and conferencing to solve staff-intensive inmate <br />movement issues has been featured. <br />
The URL can be used to link to this page
Your browser does not support the video tag.