3. Road Dept-grant applications for Harwood, Mapleton
Laserfiche
>
Public
>
County Commission
>
2007
>
10-01-2007
>
Regular agenda
>
3. Road Dept-grant applications for Harwood, Mapleton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2007 9:05:20 AM
Creation date
9/26/2007 8:05:59 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SAFE ROUTES TO SCHOOL (SRTS) PROGRAM APPLICATION <br />North Dakota Department of Transportation, Local Government <br />SFN 58504 (02-2007) <br /> <br />You may use additional sheets to further describe your project. <br /> <br />Project Neme <br />Harwood Bicycle and Pedestrian Crossing <br /> <br />Project Location <br /> <br />Harwood, ND adjacent to Cass County Highway 22 <br /> <br />Project Contact Information <br /> <br />Project Contact <br />Cass County Highway Department <br />Project Contact Name Email Address Telephone Number <br />Keith Berndt, County Engineer berndt@co.cass.nd.us 701-298-2372 <br />Address State Zip Code <br />1201 Main Avenue West, West Fargo ND 58078-1301 <br /> <br />Project Sponsor Information <br /> <br />Project Sponsor <br />Cass County Board of Commissioners <br />Project Sponsor Name Email Address Telephone Number <br />Scott Wagner, Chairman wag ners@casscountynd . gov 701-241-5720 <br />--- <br />Address Stale Zip Code <br />211 9th Street South, PO Box 2806, Fargo ND 58108-2806 <br /> <br />F d" I f tl <br /> <br />un 109 norma on <br />Project Type Project Amount Requested <br />ILl Infrastructure $150,000 <br />D Noninfrastructure Total Project CosVSource(s) <br />D Both $391,444/Cass County Government, City of Harwood, ND DOT <br /> Project Cost Estimate (attach detailed copy) <br /> $391,444 (see attached estimate) <br /> <br />Project Description <br /> <br />a: This project will create something that currently does not exist, which is a safe route to school for elementary age <br />students in Harwood. Currently there is no safe way for students to get from the west side of Harwood to the east side <br />without getting a ride in a automotive vehicle. Development in Harwood is on both sides of Interstate 29 and there <br />currently exists only an overpass bridge designed for vehicle traffic. Additionally, there is no path leading up to the <br />bridge, only highway shoulders. <br />b: please see attached document addressing the "5 E's" <br />c: Currently children do not walk to school if they live on the west side of Interstate 29. <br />d: This project creates a protected crossing over the busy interstate highway overpass bridge and a separated path <br />away from Cass County Highway 22. <br />e: The City of Harwood is committed to this project and has demonstrated its support through the promise of a $50,000 <br />investment into the project. <br /> <br />Please see the attached maps, photographs, and Study for further illustration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.