c. Joint dispatch grant application
Laserfiche
>
Public
>
County Commission
>
2007
>
07-02-2007
>
Consent agenda
>
c. Joint dispatch grant application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2007 2:07:50 PM
Creation date
6/26/2007 2:04:43 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />revolutionary change in EAP human interface through wireless modems, and helped <br /> <br />agencies fulfill their goals. <br /> <br />· Finally core product functionality must not be overlooked, as the "basics" of CAD, <br /> <br />Mobile and RMS are also affected by technology and market changes. With less <br /> <br />expensive processors / architectures, dramatically reduced disk costs, and high <br /> <br />availability systems, the ability to maintain and search historical data has risen to new <br /> <br />levels as long as the throughput on the wireless transmissions maintain pace. <br /> <br />Implementation Plan <br /> <br />The projected timetable for the completion of this project is 12 months. Once the grant is <br /> <br />awarded work on the wireless connectivity infrastructure can begin almost immediately. We <br /> <br />intend to use an experienced consultant already retained for a CAD/RMS project for any key <br /> <br />assistance we may need to assemble a complete and thorough RFP and wireless vendor selection <br /> <br />process unless sole source acquisition of equipment is determined to be justified. <br /> <br />Timeline by Quarter Activity Responsible Parties <br />First Quarter of Grant Anticipated grant award/begin Grant Contact Officer <br />Oct 2007 to Dec 2007 grant documentation <br /> Request For Proposals issued Grant Contact Officer <br /> Radio Systems Coordinator <br /> RRRDC Committee <br /> Consultant <br />Second Quarter Vendor(s) Selected RRRDC Committee <br />Jan2007 to Mar 2008 <br /> Award Contracts CassCounty Commission <br />Third Quarter Equipment Installed V endor( s) and Contractors <br />Apr 2008 to June 2008 Radio Systems Coordinator <br /> Equipment Tested V endor( s) and Radio Shop <br />Fourth Quarter System Implemented RRRDC Committee <br />July 2008 to Sept 2008 <br /> Final Grant Documentation Grant Contact Officer <br /> <br />50f7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.