Laserfiche WebLink
<br />County Engineer <br />April 16, 2007 <br />Page 2 <br /> <br />6. 100 feet of right of way should be acquired on each side of the <br />centerline in platted areas except where existing developmcnt <br />makcs it impractical. Those areas should be lookcd at on a case by <br />case basis considering both short and long term requirements. <br />7. The interim project should be designed to fit within the existing <br />right of way if practical in un-platted areas with the expectation <br />that future right of way needs will be dedicatcd at the time of <br />platting, <br /> <br />When the County first entered into a contract with SRF consulting, we wcrc planning on <br />completing thc project in 2007 so it was on a very fast track. For this reason, I believed <br />we would not have the staff time to acquire the right of way necessary in time to allow <br />for 2007 construction so I included that work on SRF's contract. Now that the project <br />will be built in 2008, I believe our county staffincluding myself could take on much of <br />the right of way acquisition work in-housc. I don't in any way intend to suggest that <br />SRF's not to exceed proposal amount is unreasonable, I do believc the 2171 hours <br />estimated to complete the right of way work is a reasonable estimate of the number of <br />hours required regardless of who does it. <br /> <br />SRF's proposal also includes subcontracted appraisal services. The proposal included <br />using RM Hoefs and Associates at a cost of$140AOO. I've asked SRF to solicit other <br />proposals for the right of way appraisals. I understand they have done so, but l' nl not <br />prcpared to makc a recommendation on which appraiscr to use as of the time of this <br />writing, <br /> <br />Summary of design and right of way services estimates: <br />priginal contrj~,~t.,with 15 parcel~ <br />Dcsign 2202 hours <br />Right of way services 741 hours <br />Appraisal Services <br />Other direct non salary expense <br />Total not to exceed price <br /> <br />ReyJ~.~,g proposal with 52 parcels <br />Design 2276 hours <br />Right of way services 2171 hours <br />Appraisal Services <br />Red River Title Services <br />Other direct non salary expense <br />Total not to exceed price <br /> <br />$175,362 <br />$68,024 <br />$20,500 <br />$24,260 <br />$288,146 <br /> <br />$183,902 <br />$200,402 <br />$140,400 <br />$13,425 <br />$27,368 <br />$565,497 <br /> <br />By using in~house staff for much of the right of way work, the cost of the appraisals will <br />still go up from the $20,500 listed above. HO\'vever, cost of the right of way services <br />should be at or below the $68,024 original amOUl1t above. <br /> <br />I ,M!nm.f.llr,',(.'om!l'.Rii\:~ (~H.p'.JI.l(fl Co~:nli$:\.wr. CQtl'q:K'IllkSl<<T 17 ti#lt M\u:~' C(m">ltli:Ul(l!~ tlt('tnl) <:kit <br />