1. Road Dept contract amendment-Co Rd 17 right of way
Laserfiche
>
Public
>
County Commission
>
2007
>
04-16-2007
>
Regular agenda
>
1. Road Dept contract amendment-Co Rd 17 right of way
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2007 3:05:48 PM
Creation date
4/11/2007 8:38:13 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />rCASScdt.JN1YI <br />\GOVERNMENTj <br />1..t.1 <br /> <br />Highway <br />Department <br /> <br />Keith D. Bemdt. BE. <br />County Engineer <br /> <br />Richard S. Sieg <br />Superintendent <br /> <br />Thomas B. SoucY. P.E. <br />Design and Construction <br />Supervisor <br /> <br />1201 Main Avenue West <br />West Fargo, North Dakota <br />58078-1301 <br /> <br />701-298-2370 <br />Fax 701-298-2395 <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Cass County Commission <br /> <br />FROM: Keith Berndt, Cass County Engineer ...; (, <br /> <br />DATE: April 16, 2007 <br /> <br />SUBJECT: Cass 17 improvements right of way. <br /> <br />I'm writing to provide additional information to supplement and amend <br />the recommendations made on my April 5, 2007 memo regarding the <br />contract work for right of way acquisition on Cass 17. r m going to revise <br />my recommendation to suggest that the Commission take no action on the <br />contract amendment at this time. r would like to complete a larger portion <br />of the work with our in~house stan'to save on consulting costs. If it is still <br />necessary to signit1cantly exceed the previously approved contract <br />amount, I will place the matter on a future agenda. I would stitt like to <br />provide an update on the project and hear any comments you have. <br /> <br />The project is a 6 mile project extending from 52nd A venue South to Cass <br />16. In the bullets below I've listed some considerations applied in <br />deciding on right of way issues for this project. <br /> <br />1. 'fhe project we are planning for 2008 is an interim project. <br />2. Ultimately it is expected that a 4 lane section will be required from <br />Wall Avenue to 52nd Avenue as was identified in the 2002 corridor <br />study. <br />3. When parcels arc platted, it has been our practice to require the <br />developer to dedicate the highway right of way at no cost and this <br />practice should continue. Thercf<'lre there will he opportunity to <br />get right of way in un-platted areas in the future at no cost. <br />4. Acquisition of right of way in platted areas will not get easier or <br />less expensive with time, so we should purchase suflicicnt right of <br />way now for the current project and future 4 lane project. <br />5. In the older part of Horace, which extends from the 4-way stop <br />south about Y2 mile. it would be prohibitively expensive to acquire <br />right of way and widen the road at this time due to existing <br />structures. The improvements for this segment should be designed <br />to tit within the existing right of way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.