Laserfiche WebLink
<br />4. If the Temporary Access Permit includes the modification of an existing approach. the <br />applicant shall submit a modification guarantee for the sum of $1000 dollars (See <br />Chapter 13). <br /> <br />5. Upon receipt and approval of the items listed in Section 8.1, the Temporary Access <br />Permit. The removal or restoration date of the approach will be included with the <br />approved permit. <br /> <br />6. Upon issuance of the Temporary Access Permit, construction, modification or <br /> <br />temporary use of the approach may commence. <br /> <br />7. When all construction work is completed the applicant shall notify the Highway <br />Department to request an inspection. <br /> <br />CHAPTER 9 Field Drive Access <br /> <br />9.1 Permit Process and Requirements <br /> <br />The process for a Field Drive Access Permit consists of the following steps: <br /> <br />1. The applicant shall sign and submit an application. <br /> <br />2. A performance guarantee (See Chapter 13) in an acceptable form for $1000 dollars <br />shall be submitted. <br /> <br />3, A Field Drive Access will be permitted where, in the determination of the County <br />Engineer, the field has no other reasonable access. Typically, one field drive to a <br />property under the same ownership or controlling interest may be granted. Additional <br />Field Drive Accesses may be permitted if the necessity for such additional access is <br />demonstrated, due to topography or ongoing agricultural activities. Field Drive <br />Accesses will be kept to the minimum necessary in order to provide reasonable access <br />The permit for a Field Drive Access will state the conditions as to its use by agricultural <br />equipment only. If a change in land-use occurs and an existing access facility is <br />proposed to be used, the owner shall make application to the Highway Department to <br />continue use of the existing access facility. The application for use of the existing <br />access facility shall be reviewed as if it were a new access facility and all the provisions <br />of this Ordinance shall apply, <br /> <br />16 <br />