Laserfiche WebLink
<br /> <br />November 30, 2006 <br /> <br />Ms. Bonnie Johnson, County Coordinator <br />Cass County Courthouse <br />P. O. Box 2806 <br />Fargo, N D 58108 <br /> <br />Re: Cass County Jail Addition <br />Fargo, North Dakota #050g <br /> <br />Dear Ms. Johnson: <br /> <br />Foss Architecture & lnteriol's I'equests fron! Cass County their consicleratloll and approval of the <br />following proposal requests. Upon receipt of signed "PR's", a change order shall be written and <br />submitted for final signatures of the Contractor, Owner and Architect allowing commencement <br />of the work as defined in the proposal requests. <br /> <br />Proposal Request No. 11: <br />Construction condition required exchanging specified fixtw'es tor equal quality fixtures <br />of a different dimension. A no chanc)", price has been negotiated with the Electrical <br />Contractor. <br /> <br />Comstock Construction <br />Robert Gibb & Sons <br />Dakota Electric <br /> <br />Total <br /> <br />$ J.OO <br />0.00 <br />____0.00 <br /> <br />$ <br /> <br />G.OO <br /> <br />Proposal Request No. 12: <br />A "redundant" cooling unit was provided within tile original Bid Documents as requested <br />by Cass County which is now belllg requested to be relocated from Room H203 to existing <br />Electrical Room C 181. Therefore the following contract change is required. <br /> <br />Comstock Construction <br />Robert Gibb & Sons <br />Dakota Electric <br /> <br />Total <br /> <br />$ 0.00 <br />0.00 <br />___.-2.Q5 .00 <br /> <br />$ 265.00 <br /> <br />www.fossarch.com <br /> <br />. ~,~-"""........ - <br />