Laserfiche WebLink
<br />Ms. Bonnie Johnson <br />Page 2 <br />November 30, 2006 <br /> <br />Proposal Request No. 13: <br />Structural conditions and electrical conduits encased witllill the existing buildings CM U <br />walls need to be removed andiot' relocated in order to route aclditional ductwork to the <br />new addition. This was ovel'lookeci 01' hidden dUI'ing final design coordination. Therefore <br />this scope of labor and materials v,as not included in the final amount submitted by the <br />bidding contractors. The followin9 contract change request is an amount similar to that <br />which would have been included by all bidders had the inforlllation been available to them. <br /> <br />Comstock Construction <br />Robert Gibb & Sons <br />Dakota Electric <br /> <br />Total <br /> <br />$ 5,050.00 <br />0,00 <br />_ 2,535.00 <br /> <br />$ 7,585.00 <br /> <br />Proposal Request No. 14: <br />Chase Doors G109A and G209A were not identified in the ori'Jinal Bid Documents to <br />have a door position switch and be connected through the security electronics cabinet. <br />The following contract change IS required to assure the locked status of all doors within <br />the secure pet'imeter is consistent. The following contract change request is an amount <br />similar to that which would have been included by all bidders had the information been <br />available to them. <br /> <br />Comstock Construction <br />Robert Gibb & Sons <br />Dakota Electric <br /> <br />Total <br /> <br />$ 0.00 <br />0.00 <br />----.li) 5 .00 <br /> <br />$ 765.00 <br /> <br />If you have any questions or comlllents please contact the undersigned. <br /> <br />Sincerely, <br /> <br />Foss Archite9ture & Interiors <br />/ / // <br /> <br />By / .:;:.,/\./ ~~__~_ <br /> <br />Rick Hoganson, AI~ <br />Project Manager <br /> <br />RH/lr <br /> <br />c: Tom Dewald <br /> <br />~--,._~.,~"~--,*.",".,~>.,.""--"""",,,,, . ~ <br /> <br />-~'-""'-""'- <br />