g. Contract approval
Laserfiche
>
Public
>
County Commission
>
2006
>
09-18-2006
>
Consent agenda
>
g. Contract approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2006 8:45:55 AM
Creation date
9/12/2006 11:49:30 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sep. 7, 2006 3:53PM <br /> <br />Cass County Hig~waY Dept, <br /> <br />No,3645 p, 3/5 <br /> <br />Keith Demdt, PE <br /> <br />September 6, 2006 <br /> <br />· Data Collection & Surveys <br /> <br />. Utility Coordination <br /> <br /> <br />· Prelilninary Geometric Layout <br /> <br /> <br />. Preliminary and Final Traffic Control Layouts <br /> <br />. 30% Construction Plans and Construction Limits for Right of WilY Acquisitions <br /> <br /> <br />o Final Signing and Pavement Marking Design <br /> <br />. Final Roadway Design Plans <br /> <br />· Cost Estimates <br /> <br />· Special Provisions Data <br /> <br />. Right of Way Appl'llisal and Acquisition Services <br />· Quality Assurance/Quality Control (QNQC) <br />ASSUMPTIONS <br /> <br />This prupusal and the attached Scope of Work were prcparcp based on the lolluwing assumptions: <br /> <br /> <br />· The Cuunty will provide all vertical and horizontal survey control data for use by SRF <br /> <br />survey crews. <br /> <br />. The County will work with SRF to eslublish appropriate design standards that apply to this <br />project. This includes sample plan sets that represent the County's preferred lornurt and <br />drafiing standards. <br /> <br />. The County will provide all necessary geotechnical information and paving section <br />recommendatiuns for the projcet. <br /> <br />o The preparation of the plans and specifications will be based un ND DOT's most recent <br />versions of "Standard Specification for Road and Bridge Construction", ND DOT's most <br />recent "Supplemental Specifications", and Cass County's most recent supplemental <br />specificatiuns/special provisions. <br /> <br />o All work will be completed in Microstation Version &. <br /> <br />o Cass County will assist SRF's right of way section in the collection oftitle information as <br />listed in the detailed scope and will be actively involved in all meetings with affected <br />property owners. <br /> <br />· ""'" """" "" ~h-=,,,,_ "" rigbl of -y pl""", """'~I""",,, ~ ".0''',3 ? <br />and will be adjusted up ur down bascd on the actual direct cost billed to SRF for these , <br />services. . <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.