g. Contract approval
Laserfiche
>
Public
>
County Commission
>
2006
>
09-18-2006
>
Consent agenda
>
g. Contract approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2006 8:45:55 AM
Creation date
9/12/2006 11:49:30 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sep, 7. 2006 3:53PM <br /> <br />Cass County HighwaY Dept. <br /> <br />No.3645 P, 4/5 <br /> <br />, <br /> <br />Keith Berndt, PE <br /> <br /> <br />Septmnber 6, 2006 <br /> <br />· The County will be responsib costs associated with the project bid opening <br />including, but not limited to, ga fees, advertising, printing of plans and ~'pecifications, etc. <br />SRF will answer teehnical qu 0 s re ated to the plans, specifications, and special <br />provisions, prepare any neeessary addendwns for distrihutions by the County, and assist the <br />county with the tabulations of bids. <br /> <br />. lbis proposal does not inelude the development of any environmental document, wetlands <br />delineation or mitigations, or acquiring of my permits. <br /> <br />. This proposal does not include in-construction services, construction ..dministration, or the <br />preparations of record drawings, unless such services arc' amended to this agreement. <br /> <br />SCHEDULE <br /> <br />We will complete the fmal plans and bid doewnents by March 30, 2007, to allow for this project to <br />be constructed in 2007 per your request, unless a mutually ugreed extension is required due to <br />unforescen factors. Project milestones are as follows: <br /> <br />Maior Task <br /> <br />Completion Date <br /> <br />Duta Collection and Swvey <br /> <br />November 10, 2006 <br /> <br />30% Plan Construction Plans and Right of <br />Way Limits <br /> <br />January 19, 2007 <br /> <br />Final Roadway Design Plans <br /> <br />March 30,2007 <br /> <br />Project Bid Opening <br /> <br />April 2007 <br /> <br />BASIS OFPAYMENTIBUDGET <br /> <br />We propose that we be reimbursed for our services on un hourly basis for the actual time expended. <br />Other direct prqject expenses, sueh as printing, supplies, reproduction, sub-consultants, etc. will be <br />billed at east, and mileage will be billed at the eurrent allowable IRS rate for business miles. <br /> <br />Dased on our understanding of the project and the attached Scope of Services, we estimate the cost <br />of our services to be $288,146.00 which inc . and expenses. Additional services that <br />may be requested will be billed on th same time and expense basis. '7 <br /> <br />Invoices are submitted on a monthly basis for work perlormed during the previous month. Payment <br />is due within 30 days. <br /> <br />'.:, <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.