06-25-2020
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2020
>
06-25-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 3:43:56 PM
Creation date
6/18/2020 3:43:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />HMG_TO01-A16_Long.docxHMG_TO01-A15_Long 2 <br />4. Provide day-to-day management oversight of Engineer’s Design Consultant <br />Teams (DCTs) for assigned Task Orders. <br />ii. Public Involvement Assistance: General responsibilities for this task include, but are not <br />limited to, the following: <br />1. Attend public meetings and meetings with individual property and business <br />owners. For requested public events, attend and give project presentations. <br />2. Prepare exhibits, displays, and presentations for public meetings. <br />3. Develop project animations of staging area and function of Diversion. <br />4. Provide up to 8 staff for individual meetings with residents in the upstream <br />staging area communities of Oxbow, Hickson, and Bakke. <br />5. Meet with individuals or agencies, and other tasks determined by Owner or <br />PMC. <br />Deliverables <br />i. Monthly reports <br />B. Project Controls: Responsibilities for this task include, but are not limited to, the following: <br />i. General <br />1. Establish and maintain task order cost and schedule reporting systems. <br />2. Prepare budget and schedule reports, implement cost and schedule variance <br />reporting systems, and issue periodic variance reports. <br />3. Establish and maintain a change control system. <br />4. Track and report status for each task order. <br />ii. USACE/Diversion Authority Compliance <br />1. Develop Project Management Guide/Protocols Document <br />2. Develop Project Specific Safety Plan <br />3. Develop Project Document Controls/Standards <br />4. Develop Quality Assurance Plan (QAP) <br />5. Develop survey standards <br />iii. Schedule Management <br />1. Review and monitor task order schedules. <br />2. Implement a schedule reporting system, which will monitor and manage the <br />progress of project tasks on a monthly basis. <br />3. Provide monthly schedule update. <br />a. PMC will provide a P6 schedule prior to the last Friday of each month. <br />b. Engineer will update the actual start and finish dates and provide <br />estimated expected finish dates based on their work progress. <br />c. Monthly schedule updates will be provided by Engineer to PMC by the <br />first Friday of the subsequent month (within one week of month end). DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.