c. Contract approval
Laserfiche
>
Public
>
County Commission
>
2006
>
08-07-2006
>
Consent agenda
>
c. Contract approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2006 9:30:48 AM
Creation date
8/1/2006 11:16:38 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />commitment unique in our industry. Upgrades occur approximately on an annual basis as <br />Siemens issues new releases. This does not include computer workstation upgrades, which <br />may need to be done occasionally. <br /> <br />D <br /> <br />Computer Workstation & Insight Software Upgrade Option: Workstation technology <br />(personal computers, monitors, printers. ,,) becomes obsolete every few years. This upgrade <br />extends the life of your HVAC control system investment without using capital investment <br />dollars to keep your workstation and software technology current. As part of this service, we will <br />replace the workstation every three (3) years and the Insight software as Siemens issues new <br />releases within the term of this contract. Replacement technology will conform to our current <br />standard configuration based on your existing system's software, firmware, and hardware. This <br />option provides one new computer per three year term. <br /> <br />Technical Support Services <br /> <br />ISI Operator Coaching: Through our individual operator coaching, we will review and reinforce <br />learned skills, leading to greater utilization of your HVAC equipment and control systems in your <br />facility. Our system experts assist your operators in identifying, verifying and resolving <br />problems found in executing tasks. During the coaching sessions, we can address log book <br />issues, assist your operators in becoming more self sufficient, and tailor HVAC control system <br />applications to the needs of your facility and to your operators' specific job responsibilities. <br /> <br />ISI <br /> <br />Automation Controls Analysis & Optimization: Automation controls can drift out of <br />calibration with changes in mechanical component performance, building use, and climatic <br />conditions. We wiil analyze and optimize automation controls in accordance with a program of <br />standard routines, including preventive maintenance, as determined by our experience, <br />equipment application and location. Automation Controls Analysis & Optimization will extend <br />equipment life, reduce energy consumption, and reduce the risk of costly and disruptive <br />breakdowns. The List of Maintained Equipment details the equipment included under this <br />service. <br /> <br />ISI Control Loop Analysis & Optimization: Control devices, such as valves, dampers, actuators, <br />etc., by their nature .Q.d!Lout of calibration with changes in mechanical efficiency, building use, <br />and climatic conditions. Through Control Loop Analysis & Optimization we ensure the control <br />loops throughout your HVAC control system experience minimized overshooting and oscillatory <br />behavior. You will benefit from lower energy consumption through more efficient equipment <br />usage. You will realize a more comfortable and productive environment. <br /> <br />ISI Network Analysis & Optimization: Through Network Analysis & Optimization, we ensure <br />reliable and optimized communication throughout your HVAC control system's building level <br />network data trunks. You will have higher data network up-time, and when infrequent problems <br />do occur, you will benefit from faster problem resolution. Using our network performance <br />diagnostic technologies, our proactive calibration and tuning of the data network analyzes <br />variables impacting network performance. These variabies include node tables, token passes, <br />turn speed, change of vaiues over the network, unresolved points, and overall operation. <br /> <br />ISI <br /> <br />Software Analysis & Optimization: Software Analysis & Optimization ensures that HVAC <br />control system application programming changes made by your staff are clear and consistent. <br />We wiil address any programming errors, failed points, points in alarm, or points in operator <br />priority. This will increase system efficiency, assure compliance to specified conditions, and <br />reduce the risk of costly and disruptive system problems. <br /> <br />Cass Co. Vector Control <br /> <br />Preventive Maintenance Agreement <br /> <br />7/14/06 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.