Laserfiche WebLink
<br />! 5.1.7 The progr.ess payment amount determined in accordance with. Section 5.L6 shall be further modified unde1: <br />the following circumstances: <br /> <br />.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the <br />full amount of the Contract Sum, less such amounts as the Architect shall determine for incomplete <br />Work, retainage applicable to such work. and unsettled claims; and <br />(Section 9.8.5 of AlA Document A201-1997 requires release of applicable retainage upon Substantial <br />Completion of Work with consent of surety, if any.) <br /> <br />.2 Add, if final completion of the Work is thereafter materially delayed fhtough no fault of the <br />Contractor, any additional amounts payable in accordance with Section 9.10.3 of AlA Document <br />A20l-l997. <br /> <br />~ 5.1.8 Reduction or limitation of retainage, if any, shall be as follows: <br />(If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from <br />the percentages inserted in Sections 5.1.6.1 and 5.1.6.2 above, and this is not explained elsewhere in the Contract <br />Documents, insert here provisions for such reduction or limitation.) <br /> <br />With satisfactory Droiect Drol!reSS and workmanshin. reiainal!e will cease once 7 .5% oftb~ contract amount <br />bas been retained. <br /> <br />~ 5.1.9 Except with the Owner's prior approval, the ContraCtor shall not make advance paymen.ts to. suppliers for <br />materials or equipment which have not been delivered and stored at the site. <br /> <br />~ 5.2 FiNAk PA~MEN.T <br />~ 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the <br />Contractor when: <br /> <br />.1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct <br />Work as provided in Section 12.2.2 of AlA Document A20l-l997, and to satisfy other requirements, <br />if any, which extend beyond final payment; and <br /> <br />.2 a [mal Certificate for Payment has been issued by the Architect. <br /> <br />~. 5.2.1 The Owner's final payment to the Contractor shaI1 be made no later than 30 days after the issuance of the <br />Architect's final Certificate for Payment, or as follows: <br /> <br />~. N/A <br /> <br />ARTICLE 6 TERMINATION OR SUSPENSION <br />g IH The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AlA Dooumem <br />A20l-l997. <br /> <br />~. 6.2 The Work may be suspended by the Owner as provided in Article 14 of AlA Document A20l-l997. <br /> <br />ARTICLE 7 MISCELLANEOUS PROVISIONS <br />~ 7.1 Where reference is made in this Agreement to a provision of AlA Document A20l-l997 or another Contract <br />Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract <br />Documents. <br /> <br />~ ti Payments due and unpaid under the Contract shall' bear interest from the date payment is due at the rate stated <br />below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is <br />located. <br />(Insert rate of intereSt agreed iiJi(Jn, if any. J <br /> <br />) ner annum <br /> <br />AlA OOCum8hf,(f01"""'.1991. copyrJght 01915,19'18,1925,1931,1951,1958,1961,1963,1967,1974,1977, 1987, 19918tid1997bYTMArmrrican. <br />Institute of Architecls. All rights reserved. WARNING: This AlAe Document Is protected by U.S. Copyright Law and Internallonal Treaties. 4 <br />UnauthorIzed reproduction or distribution of this AlAe Document, or any portion of II, may result In severe clvH and criminal penallles, and will be <br />prosecuted to the maxImum extent possible under the law. This document was produced by AlA software at 08:49:03 on 0911512005 under Order <br />1'110.1 ()()0192558_1 which expires on 8111/2006, and is not for resale. <br />User Noles: (691706547) <br />