Amended items
Laserfiche
>
Public
>
County Commission
>
2005
>
09-19-2005
>
Amended items
>
Amended items
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2005 10:33:15 AM
Creation date
9/19/2005 10:32:15 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AltemateNo; M~l- SPOOl! Construction'-Mechanical Work for the additiona:lamount of Ten Thousand Dollars and <br />NollOO (+$10.000.00). <br />Alternate No. M-2 - Summer Boiler for the additioruu amount of Fifty-ODe Thousari.d. Seven Hundred Fifty Dolfurs <br />and Noll 00 (+$51.750.00). <br /> <br />~ ,(:Himt pnces, If any, are as follows: <br /> <br />Description <br />N/A <br /> <br />Units <br /> <br />Price ($ 0.00) <br /> <br />ARTIClE 5 PAYMENTS <br />! 5.1 PROGRESS PAYMENTS <br />! 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for <br />Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the <br />Contractor as provided below and elsewhere in the Contract Documents. <br /> <br />~ 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last da)' of <br />the month, or as follows: <br /> <br />! 5.1.3 Provided that an Application for Payment is received by the Architect not later th.an the Twenty-fifth day of <br />a month, tlie Owner shall make paymentto the Contractor not later.than the .uw day of the follO\vin~ month. If an <br />Application ror Payment IS reCeIved oy the An:hitecf after the application date fued' above, payment sllalf De made <br />by the Owner not later than Forty-Five ( 45 ) days after the Architect receives the Application for Payment. <br /> <br />! 5,1.4Eacll Application for Payment shall be ba:sed on the inO'St recent schedule of \'alues submitted by the <br />Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract <br />Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported <br />by suchWita to substantiate its accuracy as the Architect n;lilY req\lire. 'Jbis schedule, unless objected. to by the <br />Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. <br /> <br />~ 5.1.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the <br />end of the period covered by the Application for Payment. <br /> <br />~ 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be <br />computed as follows: <br /> <br />.1 Take that portion of the Contract Sumproperly allocable to compl~ted Work as d~termined by <br />niiiitiplyfiig the percentage completion of each portion of the Wod by the shafe of iiie Confract Sum <br />allocated to that portion of the Work in the schedule of values, less retainage of Ten percent ( <br />10.00% ). Pending final determination of cost to the Owner of changes in the Work, amounts not in <br />dispute sfuill be incloded a:s provided in Sectlon7.3:8 of AlA Document A201-1997; <br /> <br />.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and <br />suitably stored at the site for subsequent incorporation in the completed construction (or, if approved <br />in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less <br />retainage of Ten nercent ( ~); <br /> <br />.3 Subtract the aggregate of previous payments made by the Owner; and <br /> <br />.4 Subtract amounts. if any. for which the Architect has withheld or nullified a Certificate rot: }>aymenl <br />as provided in Section 9.5 of AlA Document AZOl-l997. <br /> <br />NA-DocumeiitA10,lII":199'7. Copyright 0 1!H5,1~i8,1~25.1~37, 1~S1, 1958,1!l61, 1963,1!l67, 1&74; 19n, 1987, 1991altd1991IiyTh&Affleiican <br />Institute of Architects. All rights reserved. WARNING: This AlAe Document Is protected by U.s. Copyright Law and International Treaties. 3 <br />Unauthorized reproductIon or distribution of thIs AlAe Document, or any portion of h, may result In severe civil and criminal penahles. and will be <br />prosecuted 10 the maximum extent possible under the law. This document was produced by AlA software at 08:49:03 on 0911512005 under Order <br />/11,0.1099192558_1 which expires on 8/1112006, and Is nollor resale. <br />User Noles: (691706547) <br />
The URL can be used to link to this page
Your browser does not support the video tag.