Amended items
Laserfiche
>
Public
>
County Commission
>
2005
>
09-19-2005
>
Amended items
>
Amended items
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2005 10:33:15 AM
Creation date
9/19/2005 10:32:15 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(ljsury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws <br />and other regulations at the Owner's and Contractor's principal places of business, the location of the Project and <br />elsewhere may affeci the validity of this p':ovisio"~ Legal advice should be obtained with respect to deletioiis or <br />modifications, and also regarding requirements such as written disclo.sures or waivers.) <br /> <br />~ 7.3 The Owner's representative is: <br />(Name, address and other information) <br /> <br />Bon.n.ie JohllSon. Count,. Coordinator <br />Cass Count v Courthouse <br />211 Ninth Street South <br />Farllo. North Dakota 5&103 <br /> <br />l7.4 The Contractor's representative is: <br />(Name, address and other information) <br /> <br />Ted Malaterre <br />Robert Gibb & Sons. Inc. <br />205 40th Street Southwest <br />P. O. Box 10188 <br />Fargo. NO 58I03158t06 <br /> <br />~.. 7.5 Neither the Owner's nor the Contractor's representative shall be. changed Without ten. days written notice to the <br />other party. <br /> <br />~ 7.6 Other provisions: <br /> <br />NIA <br /> <br />ARTICLE 8 ENUMERATION OF CONTRACT DOCUMENTS <br />~ 8.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as <br />follows: <br /> <br />~ 8.1.1 The Agreement is this executed 1997 edition of the Standard Form of Agreement Between Owner and <br />Contractor, AlA Document AIOl-1997. <br /> <br />g 8.1.2 The General Conditions are the 1997 edition of the General Conditions of the Contract for Construction, AlA <br />Document A20l-1997. <br /> <br />~ 8.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated <br />Julv.2oo5 , and are as follows <br /> <br />Document <br />Article 15 <br /> <br />Title <br />Suvulementarv Conditions <br /> <br />Pages <br />~ <br /> <br />~ 8.1.4 The Specifications are those contained in the Project Manual dated as in Section 8.1.3, and are as follows: <br />(Either list the Specifications here or refer to an exhibit attached to this Agreement.) <br />Title of Snecifications exhibit: Table of Contents-Books 1 and 2 - Bidding and Contract ReQuirements. Division 15- <br />Mechanical (Plumbing & SDrinklers) and Division 15 - Mechanical (}IV AC). <br />SeGtiOR +itle Pages <br /> <br />AlA DOCument AlOll11=f997. Copy;Jgbf @1915~ 1918, 1925. 1931, 1951. 1958; 1961, 1963. 1967, 197of, 1977. 1\187.1991 amt1!Kt7by TheAmeriean. <br />Institute of Architecls. All rights reserved. WARNING: This AlAe Document Is protected by U.S. Copyright Law and International Treaties. 5 <br />Unauthorized reproduction or distribution of this AlAe Document, or any portion of It. may result In severe civil and criminal penalties, and will be <br />prosecuted to the maximum eXlent possible under the law. This document was produced by AlA software at 08:49:03 on 0911512005 under Order <br />1IIo.10<l0192558_1 which expires on 8/1112006, and is not for resale. <br />User Notes: (691706547) <br />
The URL can be used to link to this page
Your browser does not support the video tag.