TECHNICAL ADVISORY GROUP RECOMMENDATION <br />TAG_CONTRACTINGRECOMMENDATIONFORM_WP-43CD_MEYER_CO-06_2019-0213 4 <br />a. The Contractor was paid for the actual subcut quantities furnished at  <br />the unit bid price for this bid item.  <br />iv. Bid item #0180 (CO‐4: 2018 Daily Standby Time, Jan 1‐Apr 30, 2018) ‐ a 2% unit quantity  <br />increase resulting in a $11,145 increase and Bid item #0181 (CO‐4: 2018 Daily Standby  <br />Time, Jan 1‐Apr 30, 2018) ‐ a 28% unit quantity increase resulting in a $35,945 increase:  <br />1. For bid item #0180, Change Order No. 4 set the unit price for standby time (per  <br />day) for an estimated number of days assuming a work suspension end date of  <br />April 30, 2018.   <br />a. The work suspension ended May 2, 2018 resulting in 2 extra days of  <br />standby time paid to the Contractor at the approved unit rate.   <br />2. For bid item #0181, this lump sum item includes multiple unit and lump sum  <br />items negotiated in Change Order No. 4.  The lump sum items in it were fixed  <br />but the Contractor would be paid for actual unit price items.   <br />a. The additional cost was largely due to additional unit rate April  <br />mobilization costs.  The unit rate and an estimated number of units  <br />(hours) were included in Change Order No. 4.  The actual amount of  <br />April mobilization was greater than the estimated amount and the  <br />Contractor was paid for the additional hours at the approved unit rate.   <br />2. Additional Drainage Swale (COR 0033‐100027):  Upon inspection of the east side of levee 43C near levee  <br />station C5+00 the Engineer determined additional drainage work was required for the benefit of the  <br />project and to reduce the risk of future maintenance.  This work was not included in the original  <br />Contract Documents.  The Engineer directed the Contractor to complete the work on a time and  <br />materials basis.    <br />a. This change adds Bid Item 0191, CO‐6: Additional Drainage Swale: lump sum quantity 1.0 LS at  <br />the Contract Unit Price of $2,201.37 per LS for a price increase of $2,201.37.  <br />3. Pump Station Formwork Rental (COR 9000036):  The Contractor incurred additional rented structure  <br />formwork material costs due to the Owner issued work suspension directive.  The Engineer concurs and  <br />recommends this cost change.  Note that this should have been included in CO‐4 but was omitted, and is  <br />a legitimate shutdown cost.       <br />a. This change adds Bid Item 0192, CO‐6: Pump Station Formwork Rental: lump sum quantity 1.0 LS  <br />at the Contract Unit Price of $2,990.00 per LS for a price increase of $2,990.00.  <br />4. Additional Traffic Control (COR 9000056): Due to weather and utility installation delays by others, the  <br />Contractor incurred additional, Cass County Hwy Dept required, traffic control costs to provide proper  <br />separation of public traffic on Hwy 81 during heavy civil and paving operations after the road closure  <br />ended.  The Engineer concurs and recommends this cost change.    <br />a. This change adds Bid Item 0193, CO‐6: Additional Traffic Control: lump sum quantity 1.0 LS at  <br />the Contract Unit Price of $731.50 per LS for a price increase of $731.50.  <br />5. Remove Control Structures (COR 9000057): Upon inspection of the east side of levee 43C near levee  <br />stations C3+20, C11+00, and C38+00 the Engineer determined removal of existing storm sewer  <br />structures and additional drainage work was required for the benefit of the project and to reduce the