Laserfiche WebLink
TECHNICAL ADVISORY GROUP RECOMMENDATION <br />TAG_CONTRACTINGRECOMMENDATIONFORM_WP-43CD_MEYER_CO-06_2019-0213 2 <br />Original  <br />Agreement or  <br />Amendment  <br />Budget ($)  <br />Change  <br />Original Project  <br />Cost  <br />Revised Project  <br />Cost Project Start  <br />Project  <br />Completion Comments  <br />Change Order  <br />No. 1  <br />$7,383.47  $10,406,859.68 09‐Aug‐17 31‐Oct‐18 Add heat‐shrink sleeves, additional  <br />steel pipe bedding, backfill, and  <br />time.  <br />Change Order  <br />No. 2  <br />$508,207.56  $10,915,067.24 09‐Aug‐17 31‐Oct‐18 Incorporate WCD‐001 and WCD‐002;  <br />add additional borrow pit stripping;  <br />utility work; and a temporary access  <br />road.  <br />Change Order  <br />No. 3  <br />$38,822.49  $10,953,889.73 09‐Aug‐17 31‐Oct‐18 Add additional project components,  <br />changed conditions price  <br />adjustment, relocation of utility lines  <br />and stock piles, additional drainage  <br />grading, expedited freight charges,  <br />and 6.5 days to Milestone 8.  <br />Change Order  <br />No. 4  <br />$978,114.72   $ 11,932,004.45 09‐Aug‐17 2‐Dec‐18 Add tree removal, 2017 cumulative  <br />delays and milestone days, pump  <br />station luminaries, fire hydrant  <br />removal, Hwy 81 levee sub‐cut,  <br />additional survey, additional  <br />barricades, stand‐by time, Hwy 81  <br />overlay, assess liquidated damages,  <br />and incorporate WCD‐03.  <br />Change Order  <br />No. 5  <br />$13,888.70   $ 11,945,893.15 09‐Aug‐17 21‐Dec‐18 Incorporate WCD‐04 and adjust  <br />Contract Times.  <br />Change Order  <br />No. 6  <br />$203,981.64   $ 12,149,874.79 09‐Aug‐17 21‐Dec‐18 Balance unit quantities, add various  <br />change items to the Contract, and  <br />add Contract Time.  <br />  <br />Financial Considerations:  <br />Attached for your review and action is draft CO‐06.  The PMC and the EOR have reviewed CO‐06 and feel the  <br />proposed costs and level of effort are reasonable.  This change order increases the total Contract Price  <br />$203,981.64 and adds four (4) days to specific Contract Times. The following items are included in this change  <br />order:  <br />1. Unit Price Quantity balancing:  Unit Price quantities in the Contract were estimated quantities based on  <br />the project design and the final furnished and installed quantities may differ.  For this project, the  <br />furnished and installed quantities of sixty eight (68) Unit Price items differed from the estimated  <br />Contract quantities and these changes modify those Unit Quantities to match the final furnished and  <br />installed quantities, resulting in a Contract Price increase of $139,347.99.  The attached Unit Price  <br />Schedule shows these changes by line item.  <br />a. For most of these unit quantity changes, the percentage difference is typical for estimated Unit  <br />Price Work, or the quantities were partially or wholly added/removed from the project at the  <br />direction of the Owner or Engineer but the final quantity was not accounted for until the end of  <br />the project.    <br />b. For the remaining unit quantity changes, the following explanations are provided: