Laserfiche WebLink
METRO FLOOD DIVERSION PROJECT <br /> <br />TAG_CONTRACTINGRECOMMENDATIONFORM_WP-43CD_MEYER_CO-06_2019-0213 1 <br />Technical Advisory Group Recommendation Meeting Date: 02/13/2019  <br />RECOMMENDATION FOR ACTION:  <br />The Technical Advisory Group has reviewed and recommends approval of the following Contract Action(s).  <br />SUMMARY OF CONTRACTING ACTION:  <br />Per the contract review and approval procedures that were adopted by the Diversion Authority on November  <br />10, 2016 and amended August 23, 2018, the Owner’s Program Management Consultant (PMC) or Engineer of  <br />Record (EOR) shall submit construction Change Order requests that are greater than $50,000 to the Technical  <br />Advisory Group. The Technical Advisory Group shall review the Change Order request during its next regular  <br />meeting after receiving the Change Order request, and make a recommendation as to approval or denial of the  <br />Change Order request.  <br />The Owner’s Representative has prepared the following Contract Action(s):   <br />Description <br />Budget <br />Estimate ($) <br /> <br />WP-43CD: Meyer Contracting, Inc. <br />Change Order #06 $203,981.64  <br /> Balance unit quantities   <br /> Add various changes to the Contract  <br /> Add Contract Time  <br />  <br />Summary of Contracting History and Current Contract Action:  <br />The Diversion Authority awarded the WP‐43CD (OHB Ring Levee – Phases C and D) construction contract to  <br />Meyer Contracting, Inc. (Contractor) on July 13, 2017.    <br />Since the start of construction, several contract change items have been identified and incorporated into Change  <br />Orders.  The Contractor, Engineer of Record, and Owner have since identified and addressed various additional  <br />change items.    <br />This change order adds various Owner or Engineer directed work changes, adjusts Contract Times, and balances  <br />unit quantities to match furnished and installed quantities.  <br />The following is a summary of contracting history to date along with the current contracting action.  <br />Original  <br />Agreement or  <br />Amendment  <br />Budget ($)  <br />Change  <br />Original Project  <br />Cost  <br />Revised Project  <br />Cost Project Start  <br />Project  <br />Completion Comments  <br />Original  <br />Contract  <br />$0.00 $10,399,476.21  09‐Aug‐17 31‐Oct‐18 Contract Award to Meyer Consulting,  <br />Inc.