TECHNICAL ADVISORY GROUP RECOMMENDATION
<br />TAG_CONTRACTING_RECOMMENDATION_FORM_WP-42F1S_IBI_CO-20_2018-0121 2
<br />Original
<br />Agreement or
<br />Amendment
<br />Previous Project
<br />Cost
<br />Budget ($)
<br />Change
<br />Revised Project
<br />Cost Project Start
<br />Project
<br />Completion Comments
<br />H Pile, bridge abutment seal, traffic
<br />signals, bridge abutment concrete
<br />disposal and floodwall connections.
<br />Change Order
<br />No. 6
<br />16,526,931.19 89,243.21 16,616,174.40 08‐Oct‐15 15‐Jul‐17 10 Feet of additional flood wall,
<br />incentive and disincentive changes
<br />to the Agreement.
<br />Change Order
<br />No. 7
<br />16,616,174.40 16,378.55 16,632,552.95 08‐Oct‐15 22‐Jul‐17 Tee Manhole Addition, SS‐10
<br />Manhole Revision
<br />Change Order
<br />No. 8
<br />16,632,552.95 257,901.37 16,890,454.32 08‐Oct‐15 22‐Jul‐17 Differing Subsurface Conditions,
<br />floating castings
<br />Change Order
<br />No. 9
<br />16,890,454.32 (55,349.74) 16,835,104.58 08‐Oct‐15 22‐Jul‐17 Differing Subsurface Condition, Wall
<br />Penetrations, CenturyLink Concrete
<br />Removal, Furnish and Install Signal
<br />Light Pull Boxes, City Hall
<br />Construction Accommodation and
<br />Misc. Items
<br />Change Order
<br />No. 10
<br />16,835,104.58 32,505.68 16,867,610.26 08‐Oct‐15 22‐Jul‐17 Disposal of 2B Vault, Differing
<br />Subsurface Conditions – Silo Disposal
<br />in Case Plaza, and Floodwall Cap
<br />Modification
<br />Change Order
<br />No. 11
<br />16,867,610.26 52,242.85 16,919,853.11 08‐Oct‐15 22‐Jul‐17 Differing Subsurface Conditions July
<br />Removals, Repair Storm Manholes,
<br />Contaminated Soils Removal, Storm
<br />Structure ST‐8 Cover, Impressioned
<br />Concrete Modifications,
<br />Administrative – Accounting Change,
<br />Administrative – Owner’s Rep and
<br />Engineer Roles and Responsibilities
<br />Change
<br />Change Order
<br />No. 12
<br />16,919,853.11 85,411.36 17,004,753.35 08‐Oct‐15 22‐Jul‐17 Differing Subsurface Conditions,
<br />Repair Storm Manholes
<br />Change Order
<br />No. 13
<br />17,004,735.35 75,899.63 17,080,652.98 08‐Oct‐15 22‐Jul‐17 Utility Vault Adjustment, 1st Ave N
<br />Bridge Spall Removal, 42A2 Pump
<br />Station Elevation Discrepancy, Flared
<br />End Section Riprap, Case Plaza
<br />Parking Lot
<br />Change Order
<br />No. 14
<br />17,080,652.98 81,306.44 17,154,700.72 08‐Oct‐15 22‐Jul‐17 Streetlight Modifications, City of
<br />Fargo Library Landscaping, Epoxy
<br />Paint, Differing Site Conditions, 3rd
<br />Street Lighting Modifications, 1st Ave
<br />Plaza Bench Modifications, and
<br />Topsoil Import
<br />Change Order
<br />No. 15
<br />17,154,700.72 (416,726.77) 16,737,973.95 08‐Oct‐15 22‐Jul‐17 WP42A2 Gate Transfer; Quantity
<br />Balancing and Differing Subsurface
<br />Conditions
<br />Change Order
<br />No. 16
<br />16,737,490.08 101,473.05 16,838,963.13 08‐Oct‐15 14‐Nov‐17 Diesel Generator Modifications,
<br />Landscaping, Case Plaza Parking Lot
<br />Striping, and Balance Quantities of
<br />Unit Rate Items
|