Laserfiche WebLink
TECHNICAL ADVISORY GROUP RECOMMENDATION <br />TAG_CONTRACTING_RECOMMENDATION_FORM_WP-42F1S_IBI_CO-20_2018-0121 2 <br />Original  <br />Agreement or  <br />Amendment  <br />Previous Project  <br />Cost  <br />Budget ($)  <br />Change  <br />Revised Project  <br />Cost Project Start  <br />Project  <br />Completion Comments  <br />H Pile, bridge abutment seal, traffic  <br />signals, bridge abutment concrete  <br />disposal and floodwall connections.  <br />Change Order  <br />No. 6  <br />16,526,931.19 89,243.21 16,616,174.40 08‐Oct‐15 15‐Jul‐17 10 Feet of additional flood wall,  <br />incentive and disincentive changes  <br />to the Agreement.  <br />Change Order  <br />No. 7  <br />16,616,174.40 16,378.55 16,632,552.95 08‐Oct‐15 22‐Jul‐17 Tee Manhole Addition, SS‐10  <br />Manhole Revision  <br />Change Order  <br />No. 8  <br />16,632,552.95 257,901.37 16,890,454.32 08‐Oct‐15 22‐Jul‐17 Differing Subsurface Conditions,  <br />floating castings  <br />Change Order  <br />No. 9  <br />16,890,454.32 (55,349.74) 16,835,104.58 08‐Oct‐15 22‐Jul‐17 Differing Subsurface Condition, Wall  <br />Penetrations, CenturyLink Concrete  <br />Removal, Furnish and Install Signal  <br />Light Pull Boxes, City Hall  <br />Construction Accommodation and  <br />Misc. Items  <br />Change Order  <br />No. 10  <br />16,835,104.58 32,505.68 16,867,610.26 08‐Oct‐15 22‐Jul‐17 Disposal of 2B Vault, Differing  <br />Subsurface Conditions – Silo Disposal  <br />in Case Plaza, and Floodwall Cap  <br />Modification  <br />Change Order  <br />No. 11  <br />16,867,610.26 52,242.85 16,919,853.11 08‐Oct‐15 22‐Jul‐17 Differing Subsurface Conditions July  <br />Removals, Repair Storm Manholes,  <br />Contaminated Soils Removal, Storm  <br />Structure ST‐8 Cover, Impressioned  <br />Concrete Modifications,  <br />Administrative – Accounting Change,  <br />Administrative – Owner’s Rep and  <br />Engineer Roles and Responsibilities  <br />Change  <br />Change Order  <br />No. 12  <br />16,919,853.11 85,411.36 17,004,753.35 08‐Oct‐15 22‐Jul‐17 Differing Subsurface Conditions,  <br />Repair Storm Manholes  <br />Change Order  <br />No. 13  <br />17,004,735.35 75,899.63 17,080,652.98 08‐Oct‐15 22‐Jul‐17 Utility Vault Adjustment, 1st Ave N  <br />Bridge Spall Removal, 42A2 Pump  <br />Station Elevation Discrepancy, Flared  <br />End Section Riprap, Case Plaza  <br />Parking Lot  <br />Change Order  <br />No. 14  <br />17,080,652.98 81,306.44 17,154,700.72 08‐Oct‐15 22‐Jul‐17 Streetlight Modifications, City of  <br />Fargo Library Landscaping, Epoxy  <br />Paint, Differing Site Conditions, 3rd  <br />Street Lighting Modifications, 1st Ave  <br />Plaza Bench Modifications, and  <br />Topsoil Import  <br />Change Order  <br />No. 15  <br />17,154,700.72 (416,726.77) 16,737,973.95 08‐Oct‐15 22‐Jul‐17 WP42A2 Gate Transfer; Quantity  <br />Balancing and Differing Subsurface  <br />Conditions  <br />Change Order  <br />No. 16  <br />16,737,490.08 101,473.05 16,838,963.13 08‐Oct‐15 14‐Nov‐17 Diesel Generator Modifications,  <br />Landscaping, Case Plaza Parking Lot  <br />Striping, and Balance Quantities of  <br />Unit Rate Items