METRO FLOOD DIVERSION PROJECT <br /> <br /> <br />TAG_CONTRACTING_RECOMMENDATION_FORM_WP-42F1S_IBI_CO-20_2018-0121 1 <br />Technical Advisory Group Recommendation Meeting Date: 01/09/2018  <br />RECOMMENDATION FOR ACTION:  <br />The Technical Advisory Group has reviewed and recommends approval of the following Contract Action(s).  <br />SUMMARY OF CONTRACTING ACTION:  <br />Per the contract review and approval procedures that were adopted by the Diversion Authority on November 10,  <br />2016, the Owner’s Program Management Consultant (PMC) or Engineer of Record (EOR) shall submit a  <br />construction Change Order request to the Technical Advisory Group. The Technical Advisory Group shall review  <br />the Change Order request during its next regular meeting after receiving the Change Order request, and make a  <br />recommendation as to approval or denial of the Change Order request.   <br />The Owner’s Representative has reviewed and recommends the following Contract Action(s):  <br />Description <br />Budget <br />Estimate ($) <br /> <br />WP-42F1S: Industrial Builders Inc. <br />2nd Street North (South of Pump Station) –Change Order No. 20 $ 0  <br /> Add 35 calendar days to Final Completion date  <br />  <br />Summary of Contracting History and Current Contract Action:  <br />This change order adds 35 calendar days to Final Completion to allow for additional contractor coordination and  <br />testing reports.  <br />Below is a summary of contracting history to date along with the current contracting action.  <br />Original  <br />Agreement or  <br />Amendment  <br />Previous Project  <br />Cost  <br />Budget ($)  <br />Change  <br />Revised Project  <br />Cost Project Start  <br />Project  <br />Completion Comments  <br />Original  <br />Contract  <br />0.00  <br />  <br />0.00 16,184,905.85 08‐Oct‐15 15‐Jun‐17 Contract Award recommended to  <br />lowest responsive bidder, Industrial  <br />Builders, Inc.  <br />Change Order  <br />No. 1  <br />16,184,905.85 0.00 16,184,905.85 08‐Oct‐15 15‐Jul‐17 Adds 30 days to the Contract Time,  <br />revises Interim Milestone A work  <br />items, and adds an option for  <br />descoping a portion of the Work  <br />Change Order  <br />No. 2  <br />16,184,905.85 169,490.20 16,354,396.05 08‐Oct‐15 15‐Jul‐17 Incorporates Work revisions to allow  <br />work around utility lines  <br />Change Order  <br />No. 3  <br />16,354,396.05 96,806.17 16,451,202.22 08‐Oct‐15 15‐Jul‐17 Water main, traffic poles, traffic  <br />control plan, Milestone A scope  <br />Change Order  <br />No. 4  <br />16,451,202.22 6,985.96 16,458,188.18 08‐Oct‐15 15‐Jul‐17 Bridge Lighting, concrete disposal,  <br />winter traffic control, extend 4th St  <br />signal mods requirement  <br />Change Order  <br />No. 5  <br />16,458,188.18 68,743.01 16,526,931.19 08‐Oct‐15 15‐Jul‐17 Concrete grading within pump  <br />station, Unit price change, additional