Laserfiche WebLink
<br />HMG_TO10-A8_Long 2 <br />IV. Buried water. <br />V. Buried wastewater. <br /> <br />Anticipated utilities in the Red River Levee project area include: <br />I. Overhead power, buried power. <br />II. Buried fiber optic, buried copper wire. <br /> <br />2. Services of Engineer <br />A. UTILITY RELOCATION PLAN: <br />I. Identify and field locate utilities from the Maple River to I-94. <br />II. Obtain copies of filed easements from the Maple River to I-94. <br />III. Work with impacted utility owners and provide utility relocation plans for impacted <br />utilities from the Outlet to I-94. <br />IV. Comply with requirements in the Fargo-Moorhead Metro Area Flood Risk Management <br />Utility Relocation Requirements, (MFR No. 010, CEMVP-PM-B). <br />V. Identify and field locate utilities from I-94 to the Staging Area. <br />VI. Obtain copies of filed easements from I-94 to the Staging Area. <br />VII. Meet with or contact impacted utility owners and develop preliminary utility relocation <br />plans or approaches for impacted utilities from I-94 to the Staging Area. <br />VIII. Develop preliminary utility relocation plans or approaches for impacted utilities in the 2nd <br />Street/downtown Fargo area of the Red River Levees project. <br />IX. Develop an estimated schedule or time frame and cost for each utility. <br />Deliverables: <br />I. Preliminary Utility Relocation Plans (North, South, and Red River Levees). <br />II. Final Utility Relocation Plans (North). <br />B. UTILITY RELOCATION SERVICES FOR SPECIFIC UTILITY OWNERS (NORTH): <br />I. Work with impacted utility owners to develop utility relocation documents for impacted <br />utilities. <br />II. Provide performance specifications for utilities to be relocated by utility owners. <br />III. Assist with negotiations of relocation agreements with the utility owners. <br />C. RELOCATION DESIGN: <br />I. Develop utility relocation design documents (technical specifications and drawings) for <br />utilities to be relocated under contract to the Diversion Authority. <br />1. WP-43 (OHB Ring Levee) – Construction of the OHB Ring Levee requires <br />relocation of existing utilities that cross the levee. Provide relocation design <br />documents for two (2) City of Fargo sanitary sewer force mains. Include design <br />documents in WP-43D (Road Raises and Interior drainage) design package and <br />include in ATR submittal to USACE. <br />Deliverables: DRAFT