<br />HMG_TO10-A8_Long 3 <br />I. Utility relocation design documents. <br />D. RELOCATION SUPPORT SERVICES (NORTH): <br />I. If requested by Owner or PMC, review relocation documents prepared by utility <br />companies. <br /> <br />3. Owner’s Responsibilities <br />Owner shall have those responsibilities set forth in Article 2 and in Exhibit B. <br />4. Times for Rendering Services <br />Subtask Start Time Completion Time <br />NORTH <br />Utility Relocation Plan 06/14/12 08/31/12 <br />Utility Relocation Services for <br />Specific Utility Owners <br />06/14/12 12/31/16 <br />Relocation Design 07/02/12 12/31/16 <br />Relocation Support Services 07/16/12 12/31/16 <br />SOUTH <br />Utility Relocation Plan1 02/14/13 12/31/16 <br />RED RIVER LEVEES <br />2nd Street/Downtown Area <br />Utility Relocation Plan <br />04/24/13 12/31/16 <br /> <br />5. Payments to Engineer <br />A. Owner shall pay Engineer for services rendered as follows: <br />I. Compensation for services identified under Subtasks A through D shall be on a Time and <br />Material basis in accordance with the Standard Hourly Rates shown in Appendix 2 of <br />Exhibit C of the Agreement. <br />II. The total compensation for services identified under the Task Order, for Subtasks A <br />through D is not-to-exceed amount as defined in the table below. <br />III. Estimated budget for Subtask C, Relocation Design, is based on an allowance. <br />1. Engineer will notify Owner when eighty percent (80%) of the budget on Subtask <br />C, Relocation Design, is expended. <br />2. Engineer will prepare and submit an amendment for additional compensation <br />when ninety percent (90%) of budget on Subtask C, Relocation Design, is <br />expended. <br />3. Engineer will not perform work beyond one hundred percent (100%) of the <br />budget for Subtask C, Relocation Design, without Owner’s authorization by an <br />amendment to this Task Order. <br /> <br />1 Schedule is subject to Diversion Authority obtaining rights of entry. DRAFT