Laserfiche WebLink
TECHNICAL ADVISORY GROUP RECOMMENDATION <br />2 TAG CONTRACTING RECOMMENDATION FORM WP-42A2 IBI CO-07 <br />DISCUSSION <br />1.Change Order No. 7 adds exterior pump station beacons to total an increase of $1,870.32 to the <br />Contract Price. The Change Order consists of the following items: <br />a.Pump Station Beacons – The City of Fargo requested that pump station beacons be added to the <br />exterior of the building to indicate lift station energization, pump operation, and high wet well <br />level alarm condition. This cost includes furnishment and installation of all equipment and labor <br />associated with operation beacons. CH2M and HMG have reviewed this cost and find it <br />acceptable. <br />ATTACHMENT(S): <br />1.Draft Change Order No. 7 with unit price schedule and Change Proposal Request dated 4/27/2016 <br />Submitted by: <br />John Glatzmaier <br />CH2M HILL <br />Project Manager <br />Metro Flood Diversion Project <br />Date <br />Keith Berndt, Cass County Administrator April Walker, Fargo City Engineer <br />Concur: Non-Concur: Concur: Non-Concur <br />Mark Bittner, Fargo Director of Engineering Jason Benson, Cass County Engineer <br />Concur: Non-Concur:Concur: Non-Concur <br />David Overbo, Clay County Engineer Robert Zimmerman, Moorhead City Engineer <br />Concur: Non-Concur: Concur: Non-Concur <br />Nathan Boerboom, Diversion Authority Project <br />Manager <br />Concur: Non-Concur: <br />May 21, 2016 <br />May 24, 2016 <br />May 24, 2016 <br />May 24, 2016 <br />May 24, 2016 <br />May 24, 2016 <br />May 24, 2016