05-26-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
05-26-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 3:11:26 PM
Creation date
11/28/2018 2:35:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> Change Order No. 07 <br /> <br />Date of Issuance: 5/26/2016 Effective Date: 5/26/2016 <br />Owner: Metro Flood Diversion Authority Owner's Contract No.: WP-42A.2 <br />Owner’s <br />Representative: CH2M HILL Engineers, Inc. <br />Owner’s Representative <br />Project No.: 435534 <br />Contractor: Industrial Builders, Inc. Contractor’s Project No.: <br />Engineer: Houston-Moore Group, LLC Work Package No.: WP-42A.2 <br />Project: Fargo-Moorhead Area Diversion Contract Name: <br />2nd Street/Downtown – In-Town Levees, <br />2nd Street N Pump Station, Fargo ND <br /> The Contract is modified as follows upon execution of this Change Order: <br />Description: <br />1. FURNISH AND INSTALL PUMP STATION BEACONS <br />a. Add scope and cost to accommodate Owner’s request to add beacons next to GO / NO GO alarm <br />flashing light between doors 101A and 102A by modifying bid item 019 Electrical – Exterior as <br />shown in the attached Unit Price Schedule dated May 26, 2016. <br />b. Replace plan drawings E-102 and E-108 in their entirety with the attached plans. <br />Attachments: <br />• Change Order 7 Unit Price Schedule dated 5/17/16 <br />• Plan drawings E-102 and E-108 <br /> <br />CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES <br />[note changes in Milestones if applicable] <br />Original Contract Price: 8,069,000.00 Original Contract Times: <br /> Substantial Completion: November 30, 2015 <br /> Ready for Final Payment: January 31, 2016 <br /> days or dates <br />[Increase] [Decrease] from previously approved <br />Change Orders No. 01 thru 06: <br />[Increase] [Decrease] from previously approved <br />Change Orders No. 01 thru 06: <br /> Substantial Completion: October 7, 2016 <br />649,348.67 Ready for Final Payment: December 7, 2016 <br /> days or dates <br />Contract Price prior to this Change Order: Contract Times prior to this Change Order: <br /> Substantial Completion: October 7, 2016 <br />8,718,348.67 Ready for Final Payment: December 7, 2016 <br /> days or dates <br />[Increase] [Decrease] of this Change Order: [Increase] [Decrease] of this Change Order: <br />WP-42A2_Change Order_FINAL_CO-07 Page 1 of 2 DRAFT