METRO FLOOD DIVERSION PROJECT <br />TAG CONTRACTING RECOMMENDATION FORM WP-42A2 IBI CO-07 1 <br />Technical Advisory Group Recommendation Meeting Date: 5/19/2016 <br />RECOMMENDATION FOR ACTION: <br />The Technical Advisory Group has reviewed and recommends approval of the following Contract Action(s). <br />SUMMARY OF CONTRACTING ACTION: <br />The Owner’s Representative has reviewed and recommends the following Contract Action(s): <br />List description of Contract Action(s): <br />Description <br />Budget <br />Estimate ($) <br />WP-42A.2: Industrial Builders, Inc. <br />Change Order #7 $1,870.32 <br />WP-42A.2, 2nd Street North Pump Station – Pump Station Beacons <br />Summary of Contracting History and Current Contract Action: <br />Original <br />Agreement or <br />Amendment <br />Budget ($) <br />Change <br />Original Project <br />Cost <br />Revised Project <br />Cost Project Start <br />Project <br />Completion Comments <br />Original <br />Contract <br />$8,069,000.00 $0.00 $8,069,000.00 9-Oct-14 31-Jan-16 Contract Award recommended to <br />lowest responsive bidder, Industrial <br />Builders, Inc. <br />Change Order <br />No. 1 <br />$66,920.00 $8,069,000.00 $8,135,920.00 9-Oct-14 31-Jan-16 Revisions to traffic control <br />Change Order <br />No. 2 <br />$67,397.00 $8,135,920.00 $8,203,317.00 9-Oct-14 31-Jan-16 Accommodate unforeseen <br />subsurface conditions (remove <br />concrete structure and dispose of <br />contaminated soil) <br />Change Order <br />No. 3 <br />$225,056.00 $8,203,317.00 $8,428,373.00 9-Oct-14 16-Feb-16 Change in design requirements for <br />backfill of structure <br />Change Order <br />No. 4 <br />$238,871.75 $8,428,373.00 $8,667,244.75 9-Oct-14 25-Apr-16 Baffle wall, sheeting, and 2nd Street <br />road closure <br />Change Order <br />No. 5 <br />$7,614.93 $8,667,244.75 $8,674,859.68 9-Oct-14 25-Apr-16 Physical model tests, vacuum line, <br />pump station veneer, and cold <br />weather construction costs. <br />Change Order <br />No. 6 <br />$43,488.99 $8,674,859.68 $8,718,348.67 9-Oct-14 7-Dec-16 Completion Milestone Changes, <br />Extended Warranty Duration, <br />Modifications to Trash Rack and <br />Rake, and Check Valve Replacement. <br />Change Order <br />No. 7 <br />$1,870.32 $8,718,348.67 $8,720,218.99 9-Oct-14 7-Dec-16 Pump Station Beacons