05-26-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
05-26-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 3:11:26 PM
Creation date
11/28/2018 2:35:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />DA‐HMG‐TO‐17‐A3_Long 1 <br />This is Task Order No. 17, Amendment 3, <br />consisting of 6 pages. <br />Houston‐Moore Group, LLC <br />Task Order No. 17, Amendment 3 <br />MFDA Purchase Order No. 174124 <br />Services During Construction – Work Package 42 <br />In accordance with Paragraph 1.01 of the Agreement between Fargo‐Moorhead Flood Diversion Authority <br />(“Owner”) and Houston‐Moore Group, LLC (HMG) (“Engineer”) for Professional Services – Task Order Edition, <br />dated March 8, 2012 ("Agreement"), Owner and Engineer agree as follows: <br />The parties agree that in the event of a conflict between prior versions of this Task Order No. 17 and this <br />Amendment, the terms and conditions in this Amendment shall prevail, provided however, nothing herein shall <br />preclude Engineer from invoicing for work authorized under prior versions of this Task Order and performed prior <br />to effective date of this Amendment, even to the extent such prior work was revised by this Amendment. All other <br />terms and conditions shall remain the same and are hereby ratified and affirmed by the parties. <br />REPLACE Task Order No. 17, Amendments 0, 1, and 2 in their entirety with the following: <br />1. Specific Project Data <br />A. Title: SERVICES DURING CONSTRUCTION – WORK PACKAGE 42 <br />B. Description: Provide Services During Bid (SDB) and Services During Construction (SDC) for <br />projects designed by HMG for the Fargo‐Moorhead Area Flood Diversion Project (Project). <br />C. Background: The scope of work for this Task Order includes SDB and SDC. Owner will be issuing <br />various construction packages for bid. Engineer will assist Owner with SDC, including SDB. It is <br />anticipated that the following construction contracts will be required: <br />1) WP‐42A.1, A.3 – Red River Levees – 4th Street Lift Station, Gatewell, and Outfall <br />Structure <br />2) WP‐42A.2 – Red River Levees –2nd Street Lift Station and Gatewell Structure <br />3) WP‐42F.1S – Flood Control, 2nd Street North, South of Pump Station <br />4) WP‐42H.2 – El Zagal Area Flood Risk Management – Phase 2 (SDB and SDC) <br />5) WP‐42I.1 – Mickelson Levee Extension (SDB and SDC) <br />6) WP‐42C.2 – Park East Demolition (SDB and SDC) <br />7) WP‐42C.1 – HoJo, Old Shakey’s, and FPS Demolition (SDB and SDC) <br />8) WP‐42F.1N – Flood Control, 2nd Street North, North of Pump Station (SDB and SDC) <br />9) WP‐42F.2 – Flood Control, 2nd Street South, (Park East) (SDB) <br />2. Services of Engineer <br />The following functions and activities describe the general services authorized under this Task Order, <br />Engineer will perform activities to accomplish the scope described herein, as well as other services that <br />may be mutually agreed to by the parties pursuant to the terms of the Agreement. DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.