Laserfiche WebLink
TECHNICAL ADVISORY GROUP RECOMMENDATION <br />TS CONTRACTING RECOMMENDATION_MFDA-HMG-TO17A3_2016-0523 3 <br />WP‐42F.1N CN‐XXXX 0 684,000 52,000 0 736,000  <br />TO17‐A3 WP‐42F.2 CN‐XXXX 15,000  0  0 0 15,000  <br />Subtotal TO17‐A3 15,000  684,000 52,000 0 751,000  <br />TOTAL 190,000 4,003,000 386,000 20,000 4,599,000 <br />The PMC reviewed HMG’s cost proposal and found it to be acceptable.  <br />This change amount of $751,000 is included in the FY‐2016 MFDA budget.  <br />ATTACHMENT(S):  <br />1.Draft Task Order 17, Amendment 3 <br />2. HMG Cost Proposal for WP‐42F.1N SDC <br />3. HMG Cost Proposal for WP‐42F.2 SDB <br />Presented by:  <br />John W. Glatzmaier, P.E.  <br />CH2M HILL   <br />Project Manager  <br />Metro Flood Diversion Project  <br />Date <br />Keith Berndt, Cass County Administrator April Walker, Fargo City Engineer  <br />Concur:  Non‐Concur:Concur:Non‐Concur <br />Mark Bittner, Fargo Director of Engineering Jason Benson, Cass County Engineer  <br />Concur:  Non‐Concur:Concur:Non‐Concur <br />David Overbo, Clay County Engineer Robert Zimmerman, Moorhead City Engineer <br />Concur:Non‐Concur:Concur:  Non‐Concur <br />Nathan Boerboom, Diversion Authority Project  <br />Manager  <br />Concur:  Non‐Concur: <br />May 24, 2016 <br />May 24, 2016 <br />May 24, 2016 <br />May 24, 2016 <br />May 23, 2016 <br />May 24, 2016 <br />May 24, 2016 <br />May 24, 2016