TECHNICAL ADVISORY GROUP RECOMMENDATION
<br />2 TS CONTRACTING RECOMMENDATION_MFDA-HMG-TO17A3_2016-0523
<br />Task Order 17
<br />Amendment 3
<br />$751,000 $4,599,000 1‐May‐16 31‐Jul‐17 Incorporates AWD‐00058 and includes
<br />additional SDC services for 42F.1N. Adds
<br />requirement for Engineer to note Activity ID on
<br />monthly invoices.
<br />DISCUSSION:
<br />WP‐42F.1N (Flood Control, 2nd St. N, North of Pump Station):
<br />Amendment 3 adds SDC and PM scope and budget for WP‐42F.1N. The Diversion Authority, in consultation with
<br />HMG and CH2M, has changed the scope of work of both the HMG Services During Construction (SDC) task order
<br />and the CH2M Construction Management (CM) task order.
<br />The change includes transfer of the following scope from the CM task to the SDC task:
<br />scheduling and coordination of Owner’s third party material testing firm,
<br />preparation of daily and weekly reports,
<br />development, scoping and negotiation of Change Orders,
<br />field surveys,
<br />maintenance of as‐built drawings,
<br />preparation of site visit reports,
<br />commissioning of facilities, and
<br />issuing punch lists.
<br />WP‐42F.2 (2nd Street South Levee):
<br />This AWD authorizes scope and budget for SDB for WP‐42F.2. HMG’s proposal for this work is attached, and the
<br />cost is shown in the budget table below.
<br />Amendment 3 also adds the requirement for the Engineer to note on invoices the Activity ID associated with each
<br />invoiced activity.
<br />WP‐42 SDB and SDC Budgets by Work Package and Amendment:
<br />Work Package Act. ID SDB ($) SDC ($) PM ($) On Call ($) Total ($) Amendment
<br />WP‐42A.2 &
<br />42A.1/A3 CN‐XXXX 50,000 1,300,000 180,000 20,000 1,550,000 TO17‐A0
<br />WP‐42F.1S CN‐XXXX 36,000 540,000 60,000 636,000
<br />TO17‐A1
<br />WP‐42H.2 CN‐XXXX 27,000 27,000
<br />WP‐42I.1 CN‐XXXX 15,000 15,000
<br />WP‐42C.2 CN‐XXXX 15,000 15,000
<br />Subtotal TO17‐A1 93,000 540,000 60,000 0 693,000
<br />WP‐42A.2 CN‐XXXX 192,000 192,000
<br />TO17‐A2
<br />WP42A.1/A3 CN‐XXXX 830,000 28,000 858,000
<br />WP‐42C.1 CN‐XXXX 10,000 22,000 3,000 35,000
<br />WP‐42C.2 CN‐XXXX 40,000 40,000
<br />WP‐42H.2 CN‐XXXX 263,000 38,000 301,000
<br />WP‐42I.1 CN‐XXXX 132,000 25,000 157,000
<br />WP‐F.1N CN‐XXXX 22,000 22,000
<br />Subtotal TO17‐A2 32,000 1,479,000 94,000 0 1,605,000
|