Laserfiche WebLink
  <br />HMG_TO08‐A12_LongHMG_TO08‐A112_Long.docx  9  <br />project to establish a distinct recognizable identity. The scale  <br />of the project may potentially warrant multiple  <br />complementary aesthetic treatments rather than just one  <br />uniform theme dependent upon further review.  <br />d. Prepare comparative cost estimates for each alternative.  <br />e. Prepare hydraulic structures aesthetics design drawings.    <br />i. At a minimum, prepare drawings for one (1) control structure  <br />and one (1) aqueduct.   <br />ii. Coordinate with design team members on technical aspects  <br />of the hydraulic structures designs.   <br />iii. Prepare conceptual plan, elevation, and section drawings that  <br />illustrate different hydraulic structures types using the  <br />selected preferred alternative theme(s).  <br />f. Prepare prototypical hydraulic structures aesthetics design models.  <br />Prepare conceptual 3D computer models using the Sketchup Program  <br />that illustrate prototypical conditions and select design details utilizing  <br />the selected preferred alternative theme(s).  <br />g. Develop one (1) photo‐realistic 3D visualization graphic illustrating the  <br />incorporation of the preferred alternative design at a specific project  <br />location.  <br />h. Prepare a Hydraulic Structures Aesthetics Technical Memorandum to  <br />serve as a guide for final design and as a record of the process by  <br />which aesthetic design decisions were made. Include an executive  <br />summary, narrative, design guidelines, meeting records, and a  <br />summary record of decisions matrix.   <br />i. The narrative should summarize the basis for the selected  <br />preferred alternative theme(s) and intended application  <br />including but not limited to: project background, site and  <br />community context, associated studies, alternative themes  <br />considered, bridge types, retaining wall types, and other  <br />design features.  <br />ii. Prepare hydraulic structures aesthetics design guidelines.  <br />Refine and format the graphic illustrations of the prototypical  <br />and bridge‐specific studies prepared in task above that will  <br />serve as guidelines for the final design phase of each  <br />hydraulic structures.  <br />iii. Summary Record of Decisions Matrix. In simple matrix table  <br />format, list the selected hydraulic structures aesthetic options  <br />as a quick summary reference.  <br />X. BASELINE STREAM BANK EROSION EVALUATION  <br />1. Purpose:  To establish baseline data with historical references of stream bank  <br />erosion and channel planform changes along the Red River and associated  <br />tributaries in the Fargo, ND and Moorhead, MN region using GIS aerial imagery  <br />and analysis.   <br />2. Background:  The Project is being designed and constructed to reduce the  <br />impacts of Red River flooding in the Fargo/Moorhead area.  River systems in  <br />DR <br />A <br />F <br />T