  <br />HMG_TO08‐A12_LongHMG_TO08‐A112_Long.docx  4  <br />100‐yr events.  In addition to analysis of Red River and Rush/Lower Rush River events,  <br />analyze Sheyenne River and Maple River events. Provide to USACE design teams.  <br />D. DIVERSION INLET GATES:  <br />I. Background:  the FM Diversion Feasibility Study recommended a fixed weir for the inlet  <br />to the Diversion Channel.  A gated inlet may offer some advantages over the fixed weir.  <br />II. Develop preliminary layout and sizing of a gated inlet to the Diversion channel, including  <br />gate sizing and number of gates, to pass flows up to the Inflow Design Flood (IDF).  <br />Describe operation during the Probable Maximum Flood (PMF).  <br />III. Assess capacity limitations of the Sheyenne River aqueduct for events up through the IDF.   <br />IV. Determine advantages and disadvantages of a fixed weir and a gated structure, including  <br />reliability, operability, through‐town hydrograph, environmental, and geotechnical  <br />considerations, and impacts on the volume, frequency, and duration of water in the  <br />staging and storage areas for the 10, 100, and 500 year events.  <br />V. Develop preliminary comparative cost estimates of each type of inlet.  <br />E. ON‐CALL SERVICES:  Respond to requests for services from PMC for tasks not identified to date.   <br />Requests will be provided by PMC in writing.  Work will not be performed by Engineer without  <br />authorization by PMC or Owner.  <br />Deliverables:  On‐call service deliverables as requested.  <br />I. MAXIMUM PROJECT DESIGN FLOWS.  For approximately 15 Project flow scenarios,  <br />ranging from 0 – 250,000 cubic feet per second (cfs) and with a maximum flow rate  <br />through the diversion channel of 100,000 cfs:   <br />1. Use existing model runs with Fargo Gage range of 30‐40 feet and interpolate when  <br />needed, determine the following:  <br /> Modeled flow rates through the diversion channel.  <br /> Modeled flow rates through the Red River.  <br /> The water surface elevation for the southern embankment (staging/storage  <br />area).  <br />2. For stages at the Fargo Gage up to 43 feet, conduct modeling to determine:  <br /> Modeled flow rates through the diversion channel.  <br /> Modeled flow rates through the Red River.  <br /> The water surface elevation for the southern embankment (staging/storage  <br />area).  <br />Deliverables:  Provide a table of results. Use template developed by USACE.  <br />II. LOCAL DRAINAGE PLAN. Complete the scope of work identified in AWD‐00005, currently  <br />being executed under City of Fargo contract No. 5683‐5.  <br />Deliverables:    <br />1. Technical Memorandum – Local Drainage Plan for the FM Diversion Project.  <br />2. PowerPoint Presentation.   <br />III. REACH 1 LOW FLOW CHANNEL (LFC) MEANDER MODELING.   <br />1. Model the Reach 1 LFC design developed by USACE using the RVR Meander software.  <br />DR <br />A <br />F <br />T