Laserfiche WebLink
  <br />HMG_TO08‐A12_LongHMG_TO08‐A112_Long.docx  3  <br />IV. Present meandering statistics for the Red River of the North, Rush, Lower Rush, Maple  <br />and Sheyenne rivers and compare to bankfull geometry and streamwise slopes.  <br />V. Provide initial description of approach for meander belt width analysis using RVR  <br />Meander, including modeling in probabilistic terms.  <br />VI. Develop and calibrate RVR Meander models for selected reaches of the Red River of the  <br />North, Rush, Lower Rush, Maple, and Sheyenne Rivers.  <br />Prepare a second Draft Technical Memorandum:  <br />I. Describe approach for meander belt width analysis using RVR Meander and extended  <br />geomorphologic analysis of the Red River of the North and its tributaries.  <br />II. Process data for input into meander belt width analysis of LFC.  <br />III. Provide meander belt width analysis of LFC using RVR meander, and iterations with  <br />sediment transport calculations.  <br />IV. Extend geomorphologic analysis of the Red River of the North and its tributaries,  <br />including determination of channel migration rates and channel avulsion potential over  <br />long time scales.  <br />V. Recommend design planform and cross section configuration for Final Design of LFC.  <br />Develop a brief, graphics‐rich, PowerPoint presentation of the background and results.  This  <br />presentation must be suitable for a non‐technical audience.  <br />Deliverables:  <br />I. REV2 Technical Memorandum – Meander Belt Width Analysis  <br />II. REV2 PowerPoint Presentation  <br />B. IDENTIFICATION AND ASSESSMENT OF TIE‐BACK LEVEES:  <br />I. Background:  USACE is undertaking an analysis to determine if the tie‐back levees would  <br />be classified as jurisdictional dams.  If the tie‐back levees are classified as dams, the  <br />impact to the project needs to be determined.  <br />II. Assist the Owner and PMC with identifying and assessing the impacts to the Project due  <br />to the possible reclassification of the tie‐back levees to be jurisdictional dams.  Assistance  <br />may include:  <br /> analysis and comparison of Federal, State of North Dakota, and State of  <br />Minnesota regulations  <br /> identification of applicable design criteria  <br /> analysis of floodplain impacts, including FEMA, state law and rules, and local  <br />jurisdiction regulations  <br /> assessment of spillway and flowway requirements  <br /> recommendations for options for the project  <br />C. EMB OPENINGS:  <br />I. Background:  prior to operation of the Diversion, the Fargo‐Moorhead area may  <br />experience flood events.  The partially constructed works should not increase the impacts  <br />of flooding.    <br />II. Determine the location and size of openings in the excavated material berms (EMBs) to  <br />prevent an increase in flood elevations from the “without project” case for the 10‐yr and  <br />DR <br />A <br />F <br />T