Laserfiche WebLink
  <br />HMG_TO08‐A12_LongHMG_TO08‐A112_Long.docx  2  <br />III. Identify channel avulsion using LiDAR, and develop preliminary hypothesis about  <br />possible triggers.  <br />IV. Calculate meandering planform statistics for different reaches of the Red River of the  <br />North, Rush, Lower Rush, Maple, and Sheyenne Rivers and compare bankfull geometry  <br />and streamwise slope for bracketing of the proposed planform and cross section  <br />configuration of the LFC.  <br />V. Develop RVR Meander models for selected reaches of the Red River of the North, Rush,  <br />Lower Rush, Maple, and Sheyenne Rivers to obtain calibration parameters for  <br />evaluation of the proposed planform and cross section configuration of the LFC.  <br />VI. Quantify the ultimate meander amplitude of the proposed planform configuration of  <br />the LFC using RVR Meander in probabilistic fashion to account for the observed  <br />variability in hydrologic conditions and soil properties.  <br />VII. Provide most optimal, alternative planform and cross section configuration of the LFC  <br />that minimizes meandering adjustments in both the short‐ and long‐term.  Evaluate  <br />need for lateral and vertical erosion control features in the LFC or the main diversion  <br />channel.  <br />VIII. Assess impact of different scenarios for commissioning of diversion works on short‐term  <br />LFC meandering adjustments using RVR meander in deterministic fashion.  <br />IX. Develop a summary of significant O&M activities for the West Fargo Diversion and  <br />Horace to West Fargo Diversion Channels.  This will include a map for every year since  <br />the Diversion channels were constructed, including items such as quantities and lengths  <br />of sediment removal, riprap, structure installations or modifications, or surveys.  <br />X. Provide technical assistance and review to USACE on sediment transport analysis and  <br />Geomorphology Study.  <br />The following data and definitions will be provided by USACE or Owner:  <br />I. The resistance to erosion and shear strength properties of the soils along the LFC,  <br />including ongoing laboratory tests of soil erodibility at Texas A&M, as well as more  <br />recent geotechnical field investigations conducted along the LFC and main diversion  <br />channel.  <br />II. The proposed LFC dimensions (cross sections, slope) and planform configuration.  <br />III. Design flow discharges for the LFC, including updates on the hydrology of frequent  <br />events.  <br />IV. Proposed vegetation coverage at the bottom of the main diversion channel.  <br />V. Report prepared by WEST Consultants (“Geomorphology Study of the Fargo, ND &  <br />Moorhead, MN Flood Risk Management Project”), including electronic files containing  <br />historical data compiled and new data collected.  <br />VI. Most likely scenarios for commissioning of diversion works.  <br />Prepare a first Draft Technical Memorandum:  <br />I. Summarize key findings during initial site visit.  <br />II. Describe field investigations along successive point bars in meander loops; include  <br />laboratory results of carbon dating, if available.  <br />III. Identify channel avulsion areas, and of other geomorphic features (e.g., oxbows)  <br />characterizing river dynamics over long spatial and time scales.  <br />DR <br />A <br />F <br />T