11-12-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
11-12-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 7:44:54 AM
Creation date
11/28/2018 2:35:43 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
FINAL – FMDA Detention Funding <br />Policy <br /> 7 <br />SECTION V ‐ PHASE II Submittal ‐ Land Acquisition and/or Final Design <br />Phase II FMDA Funding is to reaffirm funding commitment level based on additional project development and design <br />data completed since the Phase I Submittal. A Feasibility Study, including a geotechnical evaluation, is required for <br />Phase II Submittals. Eligible activities and applicant requirements for Phase II FMDA Funding are summarized below. <br />Eligible Activities <br /> Development of Final Design Report <br /> Construction Plans and Specifications <br /> Development of Operation and Maintenance Plan <br /> Permitting <br /> Land appraisals <br /> Preparation of Purchase and/or Easement Agreements <br /> Land Acquisition <br />Applicant Requirements <br /> Successful PHASE I FMDA Submittal <br /> Meet general criteria requirements in SECTION I of this policy manual. <br /> Feasibility Study Complete (Including Geotechnical Evaluation). <br /> Quarterly reporting on project status. (Attached Form) <br /> Three year maximum to apply for Phase III FMDA Funding. <br />Application Procedure <br /> Complete & Provide FMDA PHASE II Submittal. <br /> Update & Provide Estimated FMDA Funding Allocation Worksheet based on assumed operation in <br />Preliminary Engineer’s Report. <br />Funding Level <br />The amount of FMDA Funds available for successful Phase II Applicants will be the lesser of: <br /> 90% Total Eligible Funding, as determined from Phase II FMDA Funding Calculation Spreadsheet, less <br />Funds awarded during Phase I FMDA Funding. <br /> 50% of total costs. <br />FMDA Phase II Submittals will be reviewed and recommended for FMDA Funding based on criteria described is <br />SECTION III of this policy manual. <br />
The URL can be used to link to this page
Your browser does not support the video tag.