Laserfiche WebLink
FINAL – FMDA Detention Funding  <br />Policy   <br /> 7  <br />SECTION V ‐ PHASE II Submittal ‐ Land Acquisition and/or Final Design  <br />Phase II FMDA Funding is to reaffirm funding commitment level based on additional project development and design  <br />data completed since the Phase I Submittal. A Feasibility Study, including a geotechnical evaluation, is required for  <br />Phase II Submittals. Eligible activities and applicant requirements for Phase II FMDA Funding are summarized below.  <br />Eligible Activities  <br /> Development of Final Design Report  <br /> Construction Plans and Specifications  <br /> Development of Operation and Maintenance Plan  <br /> Permitting  <br /> Land appraisals  <br /> Preparation of Purchase and/or Easement Agreements  <br /> Land Acquisition  <br />Applicant Requirements  <br /> Successful PHASE I FMDA Submittal  <br /> Meet general criteria requirements in SECTION I of this policy manual.  <br /> Feasibility Study Complete (Including Geotechnical Evaluation).  <br /> Quarterly reporting on project status.  (Attached Form)  <br /> Three year maximum to apply for Phase III FMDA Funding.  <br />Application Procedure  <br /> Complete & Provide FMDA PHASE II Submittal.  <br /> Update & Provide Estimated FMDA Funding Allocation Worksheet based on assumed operation in  <br />Preliminary Engineer’s Report.  <br />Funding Level  <br />The amount of FMDA Funds available for successful Phase II Applicants will be the lesser of:  <br /> 90% Total Eligible Funding, as determined from Phase II FMDA Funding Calculation Spreadsheet, less  <br />Funds awarded during Phase I FMDA Funding.  <br /> 50% of total costs.  <br />FMDA Phase II Submittals will be reviewed and recommended for FMDA Funding based on criteria described is  <br />SECTION III of this policy manual.  <br />