Laserfiche WebLink
FINAL – FMDA Detention Funding  <br />Policy   <br /> 6  <br />SECTION IV ‐ PHASE I Submittal – Preliminary Design  <br />FMDA Phase I funding is intended to provide assistance to complete preliminary design on the proposed  <br />impoundment, including geotechnical evaluation. A project concept must already be identified in order to qualify  <br />for Phase I FMDA Funding. Eligible activities and applicant requirements for Phase I FMDA Funding are summarized  <br />below.  <br />Eligible Activities  <br /> Preliminary Design  <br /> Geotechnical Review  <br />Applicant Requirements  <br /> Meet general criteria requirements in SECTION I of this policy manual.  <br /> Project concept identified.  <br /> Quarterly reporting on project status.  (Attached Form)  <br /> Two year maximum to apply for Phase II FMDA Funding.  <br />Application Procedure  <br /> Complete & Provide FMDA PHASE I Submittal.  <br /> Complete & Provide Phase I Estimated FMDA Funding Allocation Worksheet based on conceptual  <br />assumptions for dam or impoundment operation.  <br />Funding Level  <br />The amount of FMDA Funds available for successful Phase I Applicants will be the lesser of:  <br /> 5% of total eligible funding, as determined from FMDA Funding Calculation Spreadsheet.  <br /> 50% of the portion of project costs not eligible for Federal or State Cost‐Share.  <br />FMDA Phase I Submittals will be reviewed and recommended for FMDA Funding based on criteria described is  <br />SECTION III of this policy manual.  <br />