Laserfiche WebLink
    <br />Recommended_Contracting_Actions_Summary_2015‐0813  11  <br />ICS, Inc. (dba Industrial Contract Services, Inc.) ADD $ 176,462.97 <br />Change Order No. 2 <br />WP‐42A.1/42A.3 (4th Street Pump Station)  <br />Description: <br />Change Order No. 2 includes the following elements:  <br />1. Various modifications, including water main relocation, storm water revisions, and other changes.  <br />2. Incorporate previously approved WCD‐0002 and WCD‐0003 (Unknown Structure Investigation and   <br />Abandonment):  <br />a. Due to the significant depth, Gatewell C, MH 7 and associated 8” piping recently discovered  <br />shall be abandoned in place and will require complete grouting. The pipes and manholes are  <br />located in the general area of the floodwall that will be constructed.  <br />b. Contractor to perform work as directed by Owner’s Representative and Engineer related to  <br />the excavation, backfill, complete grouting of Gatewell C, MH 7 and 8” pipes associated with  <br />the 2 aforementioned structures. Work shall also include driving a sheet pile at location and  <br />depth shown on the plans prepared by HMG. Contractor shall use results of previous  <br />exploratory work performed as part of WCD 002 as necessary.  <br />3. Change Order No. 1 field changes, including replacement of 12” RCP and parking lot electrical work  <br />associated with warming house electrical service work.  <br />4. Other Requirements, including spare traffic control electrical conduit, Archeological inspection of  <br />excavation, and disposal of excavated concrete debris.  <br />5. Contract time extension for weather and investigation and abandonment of Unknown Structure (17  <br />days).  <br />Estimated Cost = $ 176,462.97  <br />Recommendation: <br />The Change Order No. 2 budget of $ 176,462.97 increases the WP‐42A.1/42A.3 (4th Street Pump Station)  <br />contract budget to  $ 17,806,634.56, and is less than the remaining unencumbered FY 2015 FMDA  <br />Construction budget of $ 43,557,000. PMC recommends authorization of Change Order No. 2 for   <br />$ 176,462.97.  <br /> <br />DR <br />A <br />F <br />T