    <br />Recommended_Contracting_Actions_Summary_2015‐0813  12  <br />Industrial Builders, Inc. ADD $ 225,056 <br />Change Order No. 3 <br />WP‐42A.2 (2nd Street North Pump Station)  <br />Description: <br />Change Order No. 3 includes three distinct elements:  <br />1. Backfill below elevation 882’: Incorporate Work Change Directive 3 into Contract Price by adding line  <br />item 0027, Backfill Below 882’ as shown in attached Change Order 3 Unit Price Schedule dated 8/13/15  <br />and Increase Contract Times by 13 days to accommodate Work Change Directive 2.  <br />Cost = $158,293.32  <br />2. Backfill above elevation 882’: Increase Contract Price to accommodate a change in backfill design above  <br />elevation 882’ by adding new line item 0028, Backfill Above 882’ as shown in attached Change Order 3  <br />Unit Price Schedule dated 8/13/15. Increase Contract Times by 2 days to accommodate required  <br />backfill work above elevation 882.  <br />Cost = $61,324.68  <br />3. Furnish and install Electric Unit Heater (RFI‐029A).  <br />Cost = $1,472.00  <br />4. Furnish and install Louvers (RFI‐043)  <br />Cost = $3,966.00  <br />  <br />Recommendation: <br />The Change Order No. 3 budget of $ 225,056 increases the WP‐42A.2 (2nd Street North Pump Station)  <br />contract budget to  $ 8,424,373.00, and is less than the remaining unencumbered FY 2015 FMDA  <br />Construction budget of $ 43,557,000. PMC recommends authorization of Change Order No. 3 for $225,056.  <br />  <br />Industrial Builders, Inc. ADD $ 16,184,905.85 <br />Contact Award <br />WP‐42F.1S (Flood Control ‐ 2nd Street North Floodwall, South of Pump Station)  <br />Description: <br />Recommendation of Contract Award and Change Order No. 1.  <br />Change Order No. 1 adds 30 days to the Contract Time to accommodate a later than anticipated project  <br />start, revises Interim Milestone A work items, and adds an option for descoping a portion of the Work in  <br />the event that acquisition of some or all of three properties in the southeast corner of the project area  <br />(Case Plaza, Mid‐America Steel, and Burlington Northern‐Santa Fe) is delayed.  If Owner exercises the  <br />descope option, the Contract Price will be reduced by $1,477,720.46.  <br />  <br />The lowest and best of $ 16,184,905.85 is less than the remaining unencumbered FY 2015 FMDA  <br />Construction budget of $ 43,557,000. PMC recommends award.  <br />DR <br />A <br />F <br />T