08-13-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
08-13-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2015 10:33:44 AM
Creation date
11/28/2018 2:35:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Recommended_Contracting_Actions_Summary_2015‐0813 10 <br />Recommendation: <br />The budget increase of $ 693,000 increases the Task Order 17 budget to $ $2,243,000, and is less than the <br />remaining unencumbered FY 2015 FMDA Design/Permitting budget of $ 7,093,000. PMC recommends <br />authorization for Task Order No. 17, Amendment 1 for $ 693,000.00. <br />Houston‐Moore Group, LLC <br />Task Order No. 19, Amendment 0 Add $ 250,000.00 <br />PPP Preparation Support <br />Description: <br />Provided the following services: <br /> Provide staff to attend meetings and workshops with Owner, USACE, and PMC to develop PPP <br />procurement documents, including a two (2) day kick‐off meeting workshop with <br />owner/USACE/PMC, bi‐weekly Owner/PMC progress meetings, and Draft and Final PPP <br />procurement document review meetings. <br /> Support the preparation of Draft PPP Procurement Documents including: preparation and <br />packaging of H&H models for inclusion in the PPP procurement documents, and provide support <br />services for preparation of other PPP procurement documents as requested by the Owner, which <br />may include: Notice of Intent (NOI), Request for Qualifications (RFQ), and Request for Proposals <br />(RFP), including performance, prescriptive, and regulatory specifications. <br /> Provide Data Room Documentation Support including: descriptions of Engineer’s completed <br />technical bridge reach designs, including WP‐02 (CR‐31 Bridge and Channel), WP‐04 (Reach 3 I‐29 & <br />CR 81 Bridges and Channel), WP‐07 (CR‐32 and CR‐22 Bridges and Channel), and WP‐10A‐11 (CR‐20 <br />Bridge and Channel). <br />Background: <br />The Owner and the USACE desire to enter into a Project Partnership Agreement (PPA) for construction of <br />the Project under a Split Delivery PPP, and agree that a Split Delivery project implementation model is the <br />preferred project implementation model. The Engineer has provided H&H modeling and detailed design <br />services for the Project, and assistance from the Engineer is required to incorporate modeling and design <br />information into the PPP procurement documents. <br />Budgets for the above listed services are: <br /> Subtask 2.A (Meetings and Coordination) estimated cost budget is $ 50,000. <br /> Subtask 2.B (Preparation of Draft PPP Procurement Documents) estimated cost budget is $ <br />150,000. <br /> Subtask 2.C (Data Room Documentation Support) estimated cost budget is $ 50,000. <br /> <br />Net budget increase = $ 250,000 <br />Recommendation: <br />The Task Order 19 budget of $ 250,000 is less than the remaining unencumbered FY 2015 FMDA <br />Design/Permitting budget of $ 7,093,000. PMC recommends authorization for Task Order No. 19, <br />Amendment 0 for $ 250,000.00. <br /> <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.