06-11-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
06-11-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 12:26:01 PM
Creation date
11/28/2018 2:35:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />geotechnical, structural, electrical, architectural, civil, permitting, cost <br />estimates, and preparation of drawings and technical specifications. <br />Design road raises of CR-81, including geotechnical, geology, civil, cost <br />estimates, and preparation of drawings and technical specifications, <br />coordinate with levee design teams. <br />i. Deliverables: <br />1. 35 Percent Design Submittal – prepare preliminary <br />design submittal and submit the design report and <br />preliminary plans for review by the Diversion <br />Authority, PMC, and USACE Consistency and ATR <br />review teams. <br />2. 65 Percent Design Submittal – evaluate and <br />incorporate accepted VE proposals into the design <br />documents, advance the detailed design to <br />65 percent and submit the design report, plans and <br />specifications for review by the Diversion Authority, <br />PMC, and USACE Consistency, ATR and IEPR review <br />teams. <br />3. 95 Percent Design Submittal – evaluate and <br />incorporate 65 percent review comments into the <br />design documents, advance the detailed design to <br />95 percent and submit the design report, plans and <br />specifications for review by the Diversion Authority, <br />PMC, and USACE Consistency and ATR review teams. <br />4. Cost Estimate – prepare cost estimates for the <br />project based on the 35 percent and 95 percent <br />submittal documents. <br />5. Operation and Maintenance Plan – prepare draft <br />O&M Plan for review by Diversion Authority, PMC, <br />and USACE. Incorporate review comments and <br />prepare final O&M Plan. <br />6. Bid Document Development – incorporate <br />95 percent review comments into the design <br />documents and assist the PMC with development of <br />bid documents. <br />7. Provide a separate bid package for the pump station <br />and gatewell pre-consolidation construction <br />package. <br />8. Provide an above ground building for the <br />stormwater pump station. <br />g. WP-43E – Demolition and Utility Relocations: Develop demolition plan <br />for WP-43C Levee area (CR-81 (northeast) to Riverbend Road, <br />including utility identification, identification of structures to be sold or <br />demolished in place, environmental Phase 1, permitting, and required <br />remediation. Design utilities to be cut, capped, and removed, and <br />utilities to be relocated (coordinate with developer of new City of <br />Oxbow infrastructure), including cost estimates, and drawings and <br />HMG-TO-13-A10_Long.docx 13 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.