06-11-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
06-11-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 12:26:01 PM
Creation date
11/28/2018 2:35:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />4. Cost Estimate – prepare cost estimates for the <br />project based on the 35 percent and 95 percent <br />submittal documents. <br />5. Bid Document Development – incorporate <br />95 percent review comments into the design <br />documents and assist the PMC with development of <br />bid documents. <br />e. WP-43C - Levee Section from CR-81 (northeast) to Riverbend Road: <br />Design approximately 5,000 lf of levee, including geotechnical design, <br />civil design, permitting, cost estimates, and preparation of drawings <br />and technical specifications; coordinate design of interior levee <br />drainage with interior drainage design as part of WP-43D; coordinate <br />design of interior levee slope and recreational features with O/H/B <br />community and golf course designer. Removal/demolition of existing <br />structures and utility cut, cap and removal will be designed under <br />WP-43E. <br />i. Deliverables: <br />1. 35 Percent Design Submittal – prepare preliminary <br />design submittal and submit the design report and <br />preliminary plans for review by the Diversion <br />Authority, PMC, and USACE Consistency and ATR <br />review teams. <br />2. 65 Percent Design Submittal – evaluate and <br />incorporate accepted VE proposals into the design <br />documents, advance the detailed design to <br />65 percent and submit the design report, plans and <br />specifications for review by the Diversion Authority, <br />PMC, and USACE Consistency, ATR and IEPR review <br />teams. <br />3. 95 Percent Design Submittal – evaluate and <br />incorporate 65 percent review comments into the <br />design documents, advance the detailed design to <br />95 percent and submit the design report, plans and <br />specifications for review by the Diversion Authority, <br />PMC, and USACE Consistency and ATR review teams. <br />4. Cost Estimate – prepare cost estimates for the <br />project based on the 35 percent and 95 percent <br />submittal documents. <br />5. Bid Document Development – incorporate <br />95 percent review comments into the design <br />documents and assist the PMC with development of <br />bid documents. <br />f. WP-43D –Interior Drainage and CR-81 Road Raises: Design interior <br />drainage system for the O/H/B communities, including both new <br />drainage infrastructure and required rehabilitation or upgrades to <br />existing drainage infrastructure; design stormwater retention pond <br />and new stormwater pump station, including surveying, H&H to <br />determine ditch cross sections and slopes, culvert sizes and slopes, <br />HMG-TO-13-A10_Long.docx 12 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.