06-11-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
06-11-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 12:26:01 PM
Creation date
11/28/2018 2:35:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />technical specifications. Review adequacy of existing wastewater <br />pump station and forcemain for the 38 additional residential units. <br />i. Deliverables: <br />1. 35 Percent Design Submittal – prepare preliminary <br />design submittal and submit the design report and <br />preliminary plans for review by the Diversion <br />Authority, PMC, and USACE Consistency and ATR <br />review teams. <br />2. 65 Percent Design Submittal – evaluate and <br />incorporate accepted VE proposals into the design <br />documents, advance the detailed design to <br />65 percent and submit the design report, plans and <br />specifications for review by the Diversion Authority, <br />PMC, and USACE Consistency, ATR and IEPR review <br />teams. <br />3. 95 Percent Design Submittal – evaluate and <br />incorporate 65 percent review comments into the <br />design documents, advance the detailed design to <br />95 percent and submit the design report, plans and <br />specifications for review by the Diversion Authority, <br />PMC, and USACE Consistency and ATR review teams. <br />4. Cost Estimate – prepare cost estimates for the <br />project based on the 35 percent and 95 percent <br />submittal documents. <br />5. Bid Document Development – incorporate <br />95 percent review comments into the design <br />documents and assist the PMC with development of <br />bid documents. <br />h. VES or Value Based Design Charrette (VBDC) – facilitate a VES or VBDC <br />in accordance with USACE guidelines (up to 3 days) with staff from the <br />Diversion Authority, PMC, and USACE. Prepare and distribute <br />materials and documents, facilitate the workshop, and prepare a VES <br />report. <br />i. Coordinate and lead VES or VBDC of the five (5) O/H/B levee <br />design packages (WP-43A through WP-43E). <br />i. O/H/B Ring Levee Design Modification - 100-year Elevation <br />Provide the following design services to provide a modified levee <br />design for WP-43C and WP-43D to protect to the without project <br />100-year event elevation. Work tasks include: <br />i. Update interior flood control model based on 100-year levee <br />earthwork quantities. <br />ii. Update WP-43D plans to include 100-year levee design. <br />iii. Update WP-43C plans to include 100-yr levee design. <br />iv. Calculate earthwork balance for 100-year levee design. <br />HMG-TO-13-A10_Long.docx 14 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.