10-09-2014
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2014
>
10-09-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2014 11:42:45 AM
Creation date
11/28/2018 2:35:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />HMG_TO08‐A7_Long.docx 8 <br />4. Times for Rendering Services <br />Subtask Start Time Completion Time <br />A. Meander Belt Width Analyses April 12, 2012 October 31, 2012 <br />B. Identification and Assessment of <br />Tie Back Levees <br />June 1, 2012 October 31, 2012 <br />C. EMB Openings June 1, 2012 October 15, 2012 <br />D. Diversion Inlet Gates June 1, 2012 October 31, 2012 <br />E. On‐Call Services TBD with each task September 30, 20142015 <br /> E.I‐Maximum Project Design <br />Flows <br />July 16, 2012 October 31, 2012 <br /> E.II‐Local Drainage Plan September 13, 2012 October 31, 2012 <br /> E.III‐Reach 1 Low Flow Channel <br />Meander Modeling <br />November 8, 2012 December 31, 2012 <br /> E.IV‐Geomorphology Consulting December 13, 2012 September 30, 20132015 <br /> E.V‐MN EIS Scoping Document <br />Comment Support <br />April 24, 2013 September 30, 2014 <br /> E.VI‐MN EIS Preparation Support February 13, 2014 September 30, 20142015 <br />E.VII‐Cemetery Assessment Team <br />Support <br />October 9, 2014 March 31, 2015 <br />E.VIII‐Large Structure Team <br />Support <br />October 9, 2014 September 30, 2015 <br />5. Payments to Engineer <br />A. Owner shall pay Engineer for services rendered as follows: <br />I. Compensation for services identified under Subtasks A through E shall be on a Time and <br />Material basis in accordance with the Standard Hourly Rates shown in Appendix 2 of <br />Exhibit C of the Agreement. <br />II. The total compensation for services identified under the Task Order for Subtasks A <br />through E is not‐to‐exceed amount as defined in the table below. <br />III. Estimated budget for Subtask B, Identification and Assessment of Tie‐Back Levees, <br />Subtask C, Diversion Inlet Gates, and Subtask E, On‐Call Services, are based on an <br />allowance. <br />1. Engineer will notify Owner when eighty percent (80%) of the budget on Subtask <br />B, Identification and Assessment of Tie‐Back Levees, Subtask C, Diversion Inlet <br />Gates, and Subtask E, On‐Call Services, is expended. <br />2. Engineer will prepare and submit an amendment for additional compensation <br />when ninety percent (90%) of budget on Subtask B, Identification and <br />Assessment of Tie‐Back Levees, Subtask C, Diversion Inlet Gates, or Subtask E, <br />On‐Call Services, is expended. <br />3. Engineer will not perform work beyond one hundred percent (100%) of the <br />budget for Subtask B, Identification and Assessment of Tie‐Back Levees, <br />DR <br />A <br />F <br />T