Laserfiche WebLink
  <br />HMG_TO08‐A7_Long.docx  9  <br />Subtask C, Diversion Inlet Gates, or Subtask E, On‐Call Services, without  <br />Owner’s authorization by an amendment to this Task Order.  <br />Subtask  <br />Current  <br />Budget  <br />($)  <br />Change  <br />($)  <br />Revised  <br />Budget  <br />($)  <br />A. Meander Belt Width Analyses  307,203 0 307,203  <br />B. Identification and Assessment of Tie‐Back Levees 40,000 0 40,000  <br />C. EMB Openings (Allowance) 39,989 0 39,989  <br />D. Diversion Inlet Gates (Allowance) 55,418 0 55,418  <br />E. On‐Call Services ($250,000 Allowance) 100,000 0 100,000  <br /> E.I. Maximum Project Design Flows 13,658 0 13,658  <br /> E.II. Local Drainage Plan 9,978 0 9,978  <br /> E.III. Reach 1 LFC Meander Modeling 9,693 0 9,693  <br /> E.IV. Geomorphology Consulting 15,736 0 15,736  <br /> E.V. MN EIS Scoping Document Comment  <br />Support  <br />15,000 0 15,000  <br />E.VI. MN EIS Preparation Support 250,000 0 250,000  <br />E.VII. Cemetery Assessment Team Support  61,000 61,000  <br />E.VIII. Large Structure Team Support  25,000 25,000  <br />TOTAL 856,675 86,000 942,675  <br />B. The terms of payment are set forth in Article 4 of the Agreement and in Exhibit C.  <br />6. Consultants:   <br />A. Barr Engineering Company  <br />B. HDR, Inc.  <br />7. Other Modifications to Agreement: None  <br />8. Attachments: None  <br />9. Documents Incorporated By Reference: AWD‐00039 REV 0, Cemetery Berm Conceptual Designs and Rural  <br />Water Well Survey, dated July 10, 2014.None  <br />DR <br />A <br />F <br />T