10-09-2014
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2014
>
10-09-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2014 11:42:45 AM
Creation date
11/28/2018 2:35:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />TASK_ORDER_SUMMARY_2014‐1009.DOCX 2 <br />TASK ORDER SUMMARY <br />Houston‐Moore Group, LLC (HMG) <br />Task Order No. 8, Amendment 7 Add $ 86,000 <br />Work‐In‐Kind (WIK) <br />Description: <br />Extend the period of performance for this task order to September 30, 2015, incorporate AWD‐00039 <br />Cemetery Berm Concepts, add scope and budget for additional Cemetery Assessment support services, and <br />add scope and budget for Large Structures Team Support Services. <br />Background: <br />The period for performance for this task order expired on September 30, 2014 and is recommended to be <br />extended to the end of FY‐2015 to complete WIK support tasks. <br />AWD‐00039 authorized work for the evaluation of cemetery berm concepts. In addition to this work, <br />USACE has request additional support for the identification and evaluation of mitigation alternatives for the <br />11 cemeteries impacted by the Project. <br />Provide ongoing engineering consultation services to the USACE Large Structure Design Team to evaluate <br />and design the following structures: Diversion Inlet Structure, Red River Control Structure, and Wild Rice <br />River Control Structure. <br />Recommendation: <br />PMC recommends authorization for Task Order No. 8, Amendment 7 for $ 86,000. <br />Houston‐Moore Group, LLC (HMG) <br />Task Order No. 13, Amendment 7 Add $ 115,000 <br />Levee Design and Design Support <br />Description: <br />Provide design services to prepare an optional design for a “without project 100‐year event elevation” <br />levee. Work includes updating interior flood control model, updating levee plans, updating stormwater <br />pond designs, updating earthwork balances, updating roadway replacement plans, and updating pump <br />station design. <br />Provide real estate drawings for the El Zagal project per USACE requirements. <br />Background: <br />The Diversion Authority is considering an option to construct the remaining levee segments of the OHB ring <br />levee (WP‐43B, WP‐43C, and portions of WP‐43D) to the “without project 100‐year flood event elevation”. <br />To accommodate this design modification, several components of the levee and interior drainage designs <br />require modifications. <br />The El Zagal project was incorporated into the FM Diversion Project and real estate drawings are to be <br />prepared according to USACE requirements. <br />Recommendation: <br />PMC recommends authorization for Task Order No. 13, Amendment 7 for $ 115,000. <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.