    <br />TASK_ORDER_SUMMARY_2014‐1009.DOCX  2  <br />TASK ORDER SUMMARY <br />Houston‐Moore Group, LLC (HMG) <br />Task Order No. 8, Amendment 7 Add $ 86,000 <br />Work‐In‐Kind (WIK) <br />Description: <br />Extend the period of performance for this task order to September 30, 2015, incorporate AWD‐00039  <br />Cemetery Berm Concepts, add scope and budget for additional Cemetery Assessment support services, and  <br />add scope and budget for Large Structures Team Support Services.  <br />Background:  <br />The period for performance for this task order expired on September 30, 2014 and is recommended to be  <br />extended to the end of FY‐2015 to complete WIK support tasks.  <br />AWD‐00039 authorized work for the evaluation of cemetery berm concepts.  In addition to this work,  <br />USACE has request additional support for the identification and evaluation of mitigation alternatives for the  <br />11 cemeteries impacted by the Project.  <br />Provide ongoing engineering consultation services to the USACE Large Structure Design Team to evaluate  <br />and design the following structures: Diversion Inlet Structure, Red River Control Structure, and Wild Rice  <br />River Control Structure.  <br />Recommendation: <br />PMC recommends authorization for Task Order No. 8, Amendment 7 for $ 86,000.    <br />Houston‐Moore Group, LLC (HMG) <br />Task Order No. 13, Amendment 7 Add $ 115,000 <br />Levee Design and Design Support <br />Description: <br />Provide design services to prepare an optional design for a “without project 100‐year event elevation”  <br />levee.  Work includes updating interior flood control model, updating levee plans, updating stormwater  <br />pond designs, updating earthwork balances, updating roadway replacement plans, and updating pump  <br />station design.  <br />Provide real estate drawings for the El Zagal project per USACE requirements.  <br />Background:  <br />The Diversion Authority is considering an option to construct the remaining levee segments of the OHB ring  <br />levee (WP‐43B, WP‐43C, and portions of WP‐43D) to the “without project 100‐year flood event elevation”.   <br />To accommodate this design modification, several components of the levee and interior drainage designs  <br />require modifications.  <br />The El Zagal project was incorporated into the FM Diversion Project and real estate drawings are to be  <br />prepared according to USACE requirements.  <br />Recommendation: <br />PMC recommends authorization for Task Order No. 13, Amendment 7 for $ 115,000.    <br />DR <br />A <br />F <br />T