10-09-2014
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2014
>
10-09-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2014 11:42:45 AM
Creation date
11/28/2018 2:35:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />TASK_ORDER_SUMMARY_2014‐1009.DOCX 1 <br />Task Order and AWD Summary <br />Date: October 9, 2014 <br />Task Order and AWD Summary Budget <br />Estimate ($) <br />HMG Task Order No. 8‐Amendment 7 <br />Work‐In‐Kind (WIK) $ 86,000 <br /> Extended Period Of Performance <br /> Incorporated AWD‐00039 (Cemetery Berm Concept Designs) <br /> Added scope and budget for additional Cemetery Assessment Team Support Services <br /> Added scope and budget for Large Structures Team Support Services <br />HMG Task Order No. 13‐Amendment 7 <br />Levee Design and Design Support $ 115,000 <br /> Added scope and budget for OHB Ring Levee Design Modification – 100‐year Elevation <br /> Added scope and budget for WP‐42H (El Zagal) Real Estate Drawings <br />HMG Task Order No. 17‐Amendment 0 <br />Services During Construction $ 1,550,000 <br /> Scope and budget for Services During Construction for WP‐42A.1/A.3 (4th St Pump <br />Station and 2nd St. So. Floodwall) and WP‐42A.2 (2nd St. N. Pump Station) <br />HMG AWD‐00043 <br />Eastern Staging Area Evaluation <br /> Added Engineering Services for Evaluation of East Staging Area 10,000 <br />Total $ 1,761,000 <br /> <br /> DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.