Laserfiche WebLink
  <br />TASK_ORDER_SUMMARY_2014‐1009.DOCX  1  <br />Task Order and AWD Summary <br />Date: October 9, 2014  <br />Task Order and AWD Summary Budget <br />Estimate ($) <br />HMG Task Order No. 8‐Amendment 7  <br />Work‐In‐Kind (WIK) $ 86,000  <br /> Extended Period Of Performance  <br /> Incorporated AWD‐00039 (Cemetery Berm Concept Designs)  <br /> Added scope and budget for additional Cemetery Assessment Team Support Services  <br /> Added scope and budget for Large Structures Team Support Services   <br />HMG Task Order No. 13‐Amendment 7   <br />Levee Design and Design Support $ 115,000  <br /> Added scope and budget for OHB Ring Levee Design Modification – 100‐year Elevation  <br /> Added scope and budget for WP‐42H (El Zagal) Real Estate Drawings   <br />HMG Task Order No. 17‐Amendment 0   <br />Services During Construction $ 1,550,000  <br /> Scope and budget for Services During Construction for WP‐42A.1/A.3 (4th St Pump  <br />Station and 2nd St. So. Floodwall) and WP‐42A.2 (2nd St. N. Pump Station)   <br />HMG AWD‐00043   <br />Eastern Staging Area Evaluation   <br /> Added Engineering Services for Evaluation of East Staging Area 10,000  <br />Total  $ 1,761,000  <br />  <br />  DR <br />A <br />F <br />T