Laserfiche WebLink
<br />3. Owner's Responsibilities <br />Owner shall have those responsibilities set forth in Article 2 and in Exhibit B. <br />4. Times for Rendering Services <br />Subtask Start Time Completion Time <br />2.B.i Red River Levees – Phase 1 November 8, 2012 September 30, 2013 <br />2.B.ii Upstream Staging Area Ring Levees November 8, 2012 September 30, 2013 <br />Amendment 1 all work December 13, 2012 September 30, 2013 <br />2.B.ii.2.d WP-43A Bid Documents August 8, 2013 May 4, 2014 <br />Amendment 2 other work August 8, 2013 May 31, 2015 <br />Amendment 3 all work November 14, 2013 September 30, 2014 <br />Amendment 4 all work February 13, 2014 September 30, 2014 <br /> <br />5. Payments to Engineer <br />A. Owner shall pay Engineer for services rendered as follows: <br />i. Compensation for services identified under Subtasks 2.B.i through 2.B.ii shall be on a <br />Time and Material basis in accordance with the Standard Hourly Rates shown in <br />Appendix 2 of Exhibit C of the Agreement. <br />ii. The total compensation for services identified under the Task Order for Subtasks 2.B.i <br />through 2.B.ii is not-to-exceed amount as defined in the table below. <br />iii. Estimated budget for Subtask 2.B.ii, Upstream Staging Area Levees/Ring Dikes, is based <br />on an allowance. <br />1. Engineer will notify Owner when eighty percent (80%) of the budget on <br />Subtask 2.B.ii, Upstream Staging Area Levees/Ring Dikes, is expended. <br />2. Engineer will prepare and submit an amendment for additional compensation <br />when ninety percent (90%) of budget on Subtask 2.B.ii, Upstream Staging Area <br />Levees/Ring Dikes, is expended. <br />3. Engineer will not perform work beyond one hundred percent (100%) of the <br />budget for Subtask 2.B.ii, Upstream Staging Area Levees/Ring Dikes, without <br />Owner’s authorization by an amendment to this Task Order. <br />Subtask Current Budget <br />($) <br />Change <br />($) <br />Revised Budget <br />($) <br />2.B.i.1 Red River Levees – Phase 1 Design 435,000 0 435,000 <br />2.B.i.1.o.i Landscape Architecture/Master <br />Planning - 2nd St. Corridor from NP Ave. to <br />4th Ave. <br />35,000 0 35,000 <br />2.B.i.1.o.ii Master Planning Services - <br />Mickelson to the 4th St. Levee <br />100,000 0 100,000 <br />2.B.i.2 Red River Levees – Phase 2 Design 2,000,000 0 2,000,000 <br />2.B.i.3 Red River Levees – VES 30,000 0 30,000 <br />2.B.i.4 4th Street Levee Pump Station <br />Replacement <br />0 600,000 600,000 <br />HMG-TO-13-A4_Long.docx 13 <br />DR <br />A <br />F <br />T