Laserfiche WebLink
<br />Subtask Current Budget <br />($) <br />Change <br />($) <br />Revised Budget <br />($) <br />2.B.ii Upstream Staging Area Ring Levees <br />(Allowance) <br />425,000 0 425,000 <br />2.B.ii.2.d WP-43A Design 275,000 0 275,000 <br />2.B.ii.2.e WP-43C Design 190,000 0 190,000 <br />2.B.ii.2.f WP-43D Design 1,020,000 0 1,020,000 <br />2.B.ii.2.g WP-43E Design 260,000 0 260,000 <br />2.B.ii.2.h O/H/B Ring Levee – VES 30,000 0 30,000 <br />TOTAL 4,800,000 600,000 5,400,000 <br />B. The terms of payment are set forth in Article 4 of the Agreement and in Exhibit C. <br />6. Consultants: <br />a. Braun Intertec Corporation <br />b. Northern Technologies, Inc. <br />c. Robert Trent Jones II, LLC <br />7. Other Modifications to Agreement: None <br />8. Attachments: Figure 1 <br />9. Documents Incorporated By Reference: None <br />HMG-TO-13-A4_Long.docx 14 <br />DR <br />A <br />F <br />T